Contract notice Electrical Wiring and Fitting WorkMunich Airport 2020 1002680 ELT IT work modernization Hotel HiltonDescription The current Hilton Munich Airport hotel went into operation in April 1994 The 5 star existing hotel from 1994 has 389 rooms suites spa conference and restaurant areas The hotel complex consists of 2 wings east and west wings between which a glass roofed atrium serves as a connection Both wings house a total of 343 guest rooms and 46 suites on 4 levels and are approx 115 m long and approx 20 m wide The atrium in between has a size of approx 40 x 50 m After the completion of an extension in 2017 the existing building from the 90s is also to be modernized The measure includes the modernization of all rooms suites and corridors in the existing building as well as renovation measures on the atrium roof and the replacement of interior glazing in the atrium When modernizing the rooms and corridors all surfaces and house technology ELT IT sanitary are renewed There are also structural fire protection measures When modernizing the bathrooms bathtubs are replaced by floor level showers with shower channels The modernization of the 2 room sections takes place during the ongoing hotel operation in a stage construction The levels are served via external building lifts adaptation of the existing main building distributors GHV West and GHV Ost Erection delivery installation and commissioning of a main low voltage sub distribution per hotel wing west and east Construction delivery assembly and commissioning of 8 floor distributors for light and power 4 pieces per hotel wing Erection delivery installation and commissioning of 8 EDP floor distributors 4 pieces per hotel wing Construction delivery assembly and commissioning of 8 safety lighting centers 4 pieces per hotel wing Reinstallation of the entire electrical installation and lighting on levels 05 to 08 for both hotel wings in total 343 guest rooms 46 suites 8 technical rooms and 8 corridors Reinstallation of the entire passive IT infrastructure including connection and cabling of the network cables delivery and installation of the data connection boxes delivery and installation of the cable route systems connection of the active IT components which are supplied by the customer on levels 05 to 08 for both hotel wings in total this means 343 guest rooms 46 suites 8 technical rooms and 8 corridors Construction logistics construction electricity construction lighting demolition work The services cannot be provided in the security area of the airport Further information can be found in the contract documents Time limit for receipt of tenders or requests to participate Date 15 07 2020 Local time 12 00 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 30883583
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.