Contract notice Building Construction WorkCarpentry work modernization hotel HiltonDescription The current Hilton Munich Airport hotel went into operation in April 1994 The 5 star existing hotel from 1994 has 389 rooms suites spa conference and restaurant areas The hotel complex consists of 2 wings east and west wings between which a glass roofed atrium serves as a connection Both wings house a total of 343 guest rooms and 46 suites on 4 levels and are approx 115 m long and approx 20 m wide The atrium in between has a size of approx 40 x 50 m After the completion of an extension in 2017 the existing building from the 90s is also to be modernized The measure includes the modernization of all rooms suites and corridors in the existing building as well as renovation measures on the atrium roof and the replacement of interior glazing in the atrium When modernizing the rooms and corridors all surfaces and house technology ELT IT sanitary are renewed There are also structural fire protection measures When modernizing the bathrooms bathtubs are replaced by floor level showers with shower channels The modernization of the 2 room sections takes place during the ongoing hotel operation in a stage construction The levels are served via external building lifts The services cannot be provided in the security area of the airport Time limit for receipt of tenders or requests to participate Date 20 07 2020 Local time 12 00 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 30883576
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.