Contract notice Geotechnical Engineering ServicesPolder Bellenkopf Rappenw rt Geotechnical advice in the course of execution planning and construction geotechnical lots GEO1 and GEO2 Description II 2 4 0 Abbreviations used RHR retention space L lotPL planner lotBL construction lot BGU subsoil investigations exploration program HWD flood protection dam here Trenndamm Rheinhochwasserdamm XXV BW regulation structure inlet outlet structure II 2 4 1 Description of lot GEO1 Lot GEO1 comprises lots 1 2 3 and 8 L1 includes PL1 with the BL1 1 to BL1 4 with regard to the expansion of the Rhine side HWD 6 1 km as a dividing dam with division into four dam sections BL L2 includes PL2 with the BL2 1 to BL2 5 with five new inlet u Outlet structures BW1 to BW 5 L3 includes PL3 with the BL3 1 to BL3 6 with various adjustments in the area of the Rheinpark Naturschutzzentrum NAZKA u Hermann Schneider Allee HSA Raising the dam with street tram bike path infrastructure by approx 2 10 m with replacement new Altrhein Bridge L8 includes PL8 with the BL8 5 to BL8 7 with regard to construction measures individual objects in the RHR including paths bridges culverts game rescue hills II 2 4 2 Service specification for Lot GEO1 Pos 1 Planning and monitoring a geotechnical Exploration program Partial services to be provided Conception and Planning of the exploration program drilling programs Preparation d Procurement documents with preparation of the specification of services Participation in awarding the drilling work and Participation in educational talks Instruction drilling company u Detailed coordination before the start of execution with final determination of the drilling points taking into account the requirements of the approval Monitoring u technical Accompanying the digestion work Billing audit drilling programs Pos 2 Geotechnical advice in the course of execution planning Partial services to be provided Creation of geotechnical Expert opinion Eurocode 7 for relevant objects acc Lot GEO1 with description d Substrate conditions soil parameters for homogeneous areas recommendations for control profiles and Material requirements for the execution documentation of the results of the geotechnical and underground hydr Proof Dams Maintaining the structural safety evidence in accordance with DIN 19712 DWA leaflet 507 on main profiles in the course of execution planning finalization and Addition of required evidence on secondary profiles New buildings definition d Design situations founding recommendations geotechnical and geohydraul Required Evidence information on subsidence excavation pit water drainage building waterproofing etc Technical Coordination of the geotechnical engineer including coordination dates for individual objects with a d Planning of technical participants client planner owner of dams structures etc Pos 3 Geotechnical construction supervision during construction Partial services to be provided Participation in on site appointments with advice on construction work Random geotechnical Construction supervision especially for dam structures Creation of QA plans and geotechnical Building permits Pos 4 Field and laboratory work Item 4 1 Field work and laboratory work as part of the exploration programPartial services to be provided Field work and Laboratory work in the context of exploration for dam structures Inlet outlet structures far Single objectsItem 4 2 Field and laboratory work for control testsPartial services to be provided Field work and Laboratory work for control tests acc QA plans Review u Assessment d Try d Eigen u External monitoring Creation of monitoring reports for dam structures Item 5 Other services on call including participation in appointments from the client Partial services to be provided Participation in planning meetings Participation in appointments with public participation For more on the range of services cf additional documents under link in no I 3 II 2 4 3 Gradual commissioning scope of services and object list lot GEO1 Stage I basic order Item 1 explorations to prepare the execution planning Level II optional services Item 2 5 subject to planning approval securing financing and approval of the client for further implementation of the lots partial services Time limit for receipt of tenders or requests to participate Date 14 07 2020 Local time 10 00 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 30763144
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.