Bus Garage Construction WorkNew construction of Zeitz bus depot lot 28 energy pillars for oil compressed air electrics waterDescription New multi purpose hall including administration building as well as external structures and ancillary facilitiesBus depot ZeitzLot 28 energy pillars for oil compressed air electrics waterThe energy columns are designed with a closed housing made of sheet steel with 2 feet which are securely mounted on the floor above the existing shaft and have space for 4 hose reels at operating height 3 hose reels with nozzles and displays are installed per energy column Fresh oil is supplied from below from the on site shaft as is the compressed air supply which is electrical Supply line and the drinking water line A covered drainer with drain line and shut off for all hose reels across the entire width of the energy column is also installed A compressed air quick connection a drinking water connection with manually operated ball valve and 2 electr Connection units are mounted on the left and right on the narrow sides of the energy columns 2 sturdy brackets one on the left and one on the right of the energy columns are provided with sockets and compressed air connections Time limit for receipt of tenders or requests to participate Date 07 07 2020 Local time 10 45 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 30254795
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.