Construction Work for Water ProjectsReplacement construction of the Steinhavel barrage lot 2 fore portsDescription The WNA Berlin is planning to replace the lock to adapt the outer harbor to replace the weir to build a new access road including a crossing structure to build a fish pass and to build a slope to overcome the gradient for muscle powered sports boats The construction of the project is broken down into 3 lots Lot 1 access including culvert structureLot 2 outer portsLot 3 lock weir FAA and boat passThe erection of the culvert structure the access during construction and the associated landscape protection and landscaping measures lot 1 were awarded in September 2019 The construction of the outer harbors the sports boat waiting areas the bank protections and the associated landscape protection and landscaping measures are the subject of this tender document Lot 2 New sports boat waiting areas and bank protection structures are being built in the upper and lower outer harbor This requires floating technology In order to carry out the work in the planned time window from 10 2020 to 05 2021 5 work pontoons are required in parallel use Main works to be carried outGeneral Technical processing execution planning and creation of inventory documents construction site equipment and aids Production and dismantling of temporary transshipment points at the choice of the contractor Landscape maintenance work preparatory work clearing of construction site clearing of 6236 trees Vegetation engineering work topsoil protection approx 2 900 m2nd Tree protection vegetation protection fence length 1 240 m 30x individual tree protection species protection amphibian protection length 200 m frightening breeding birds collecting large clams Manufacture of sports boat waiting stations in the upper and lower outer harbor pre drill approx 470 m ramming route up to 8m deep Deliver approx 650 t steel sheet piling U profile S 270 approx 4 460 m2ndInsert steel sheet pile Make approx 435 m of steel belt 104 x mooring block bollard curb rail support bar according to RiGeW 27 m dolphin waiting area with equipment Make 25 anchors Make 35 m of belting 2x U300 470 m2ndCorrosion protection work Manufacture of waiting points for commercial shipping in the upper and lower port Deliver and bring in 18 steel piles 18 pieces of equipment head bollards rubbing strips 24 m2ndCorrosion protection work Production of bank protection in the upper and lower outer harbor Cancel and dispose of the 680 m machine safety device Break off 100 m bank protection pile package stone fill pre drill 260 m ramming route up to 10m deep supply approx 400 t steel sheet piling U profile S 270 approx 2 840 m2ndInsert steel sheet pile Create approx 550 m pile wall pile packages approx 1 410 m2ndMake stone fill approx 6 000 m3rdDredging including disposal Time limit for receipt of tenders or requests to participate Date 10 06 2020 Local time 10 00 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 30004207
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.