Works for Complete or Part Construction and Civil Engineering WorkRenewal E Deutzener u Luckaer Str BornaDescription EKRG measure Replacement of 2 new railway overpass in the course of a double track electrified route as reinforced concrete frame structures in the area of Luckaer Stra e additional transfer of 2 station tracksE Deutzener Stra e 2 track superstructure deep foundation clear width 14 00 m clear height 4 50E Luckaer Stra e 2x2 track superstructure Flat foundations clear width 13 00 m clear height 4 50The following work trades are planned implementation planning of all trades surveying services traffic safety and diversion measures Construction site clearance and landscaping accompanying measures earthwork and sheeting Manufacture of the bridges while minimizing the operational impact on the side next to railway facilities track works track construction Railway specific civil engineering measures and cable security measures Road and path construction B 93 S 90 access to transformer station and maintenance of detour route Demolition of existing structures as well as bridging and commissioning of the E in the course of an 8 week total closure disposal services Bridge construction 2 railway overpasses approximate information Psch construction site clearance Psch traffic safety extensive diversion 2 300 cbm demolition bridge solid masonry 9 870 cbm earthworks excavation work 1 270 cbm concrete backfill Fill 5 940 cbm construction pit 1 290 sqm sheeting partly waterproof 3 pusher devices 1 E cross lengthways 1 E 2 parts or lengthways 160 m in situ concrete piles 1 2 m 1 080 cbm underwater concrete 540 cbm substructures foundation of reinforced concrete 1 245 cbm superstructure caps reinforced concrete 520 sqm waterproofing seepage wall substructures 400 sqm waterproofing protective concrete superstructures 750 square meters of graffiti protection 171 m railing 11 pcs DN 1000 shaft 91 m drainage pipes E clear and clear 2 700 square meters 252 355 St Felling trees clearing rhizomes Road and path construction 38 m connection pipes DN 150 PE HD 250 m drain pipes DN 100 PE HD Make 820 cbm frost protection layer 0 45 Milling 1 550 square meters of asphalt Make 1 480 sqm asphalt base course AC 32 T S Make 1 480 sqm asphalt binder course AC 22 B S Make 1 480 sqm asphalt surface course SMA 11 S make 338 m channel from concrete blocks set 644 m of concrete curbs create 313 m road markings Take up 1 040 sqm layer without binder create a 200 cbm ballast base layer 0 45 Make 660 sqm top layer without binder 0 16 Make 115 cbm banquet Retrofit bypass on Luckaer Stra e approximate information Make 1 300 cbm frost protection layer 0 32 make 145 cbm banquet Milling 420 square meters of asphalt Take up 2 770 m2 of asphalt pavement Make 2 770 sqm asphalt base course AC 32 T S Create 3 192 sqm asphalt surface course AC 11 D N Interconnectivity services approximate data 330 m construction time removal and reinstallation of superstructure 1 pc Removal and reassembly of turnout during construction 350 m cable duct 2 auxiliary cable bridges 52 m steel tube crossing 130 cbm cable trench Time limit for receipt of tenders or requests to participate Date 22 06 2020 Local time 10 30 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 29723185
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.