Modernization Of Vistula Embankments In Cracow Section 1 Section 2 Section 3Contract 3A 1 Modernization Of Vistula Embankments In Cracow The Project Will Be Co Financed From The Loan Of The Council Of Europe Development Bank Ceb And The State Budget State Water Holding Polish Waters Regional Water Management Authority In Cracow Now Invites Sealed Bids From Eligible Bidders For The Realization Of The Project Described Below Description Of The Contract The Subject Of The Proceedings Is The Execution Of Works Under The Contract Entitled Modernization Of Vistula Embankments In Cracow Which Consists Of Two Lots 1 Lot 1 3A 1 1 Modernization Of Vistula Embankments In Cracow Section 1 Section 2 The Scope Of Works To Be Performed Entails Reconstruction And Extension Of The Existing Left Embankment Of The Vistula River And Of The Right And The Left Backwater Embankments At The D ubnia River And Construction Of New Section Of Backwater Embankment At The D ubnia River Section 1 Left Embankment Of The Vistula River From Km 87 600 To Km 91 797 Section 1 Right Backwater Embankment Of The D ubnia River From Km 0 000 To Km 1 832 Section 1 Left Backwater Embankment Of The D ubnia River From Km 0 000 To Km 1 133 New Backwater Embankment On The D ubnia River From Km 1 136 To Km 1 612 Section 2 Left Embankment Of The Vistula River From Km 91 997 To Km 95 162And Sections Where The Embankment Will Be Connected With Existing Infrastructure But Located Beyond The Chainage Indicated In Records Apart From Reconstruction Extension Of The Existing Embankments And Construction Of New Embankments On The D ubnia River Length Of 476 M Including Anti Seepage Shutter Made Of Bentomat In Soil With A Thickness Of Min 0 4 M At A Depth Of 3 M On The Water Side Of The Embankment The Scope Of Works For Reconstruction And Extension Of Flood Embankments On The Vistula River In Cracow Section 1 Left Embankment Of The Vistula River From Wandy Bridge To Przew z Barrage Together With Backwater Embankments On The D ubnia River Section 2 Left Embankment Of The Vistula River From Przew z Barrage To Suchy Jar Also Entails Performance Of The Following Construction Works Dismantling And Construction Of Culverts Construction Of New Pavement On The Crest Of The Embankment Made Of Gravel Mix And Broken Stone On Geofibre Construction And Reconstruction Of Service Roads And Pavement Hardened With Sand On Geofibre With Stone And Broken Stone Construction And Reconstruction Of Turnouts Extension Construction And Dismantling Of Existing Descent Roads And Crossings Reconstruction Of Utilities Steps On The Embankment Concrete Sidewalk Pile Wall Levelling Works Dismantling And Construction Of Fences Removal Of Trees And Shrubs The Detailed Description Of The Works Is Included In The Construction Designs And Associated Detailed Designs Investment Location The City And Commune Of Cracow Poland Time For Completion 518 Days 1 Lot 2 3A 1 2 Modernization Of Vistula Embankments In Cracow Section 3 Scope Of Works To Be Performed Entails Rising Of The Embankment Crest To The Designed Elevations Along With The Necessary Redevelopment Demolition And Construction Of Accompanying Facilities Embankment Locks Ditches Descend Roads And Embankment Crossings Service Roads Redevelopment Of Colliding Devices Of Technical Infrastructure Water Supply Sewerage Heating Gas Power And Telecommunication Networks Section 3 1 Over A Length Of 934 M From Embankment S Register Chainage Km 81 193 River Vistula Chainage Km 81 256 To Embankment S Register Chainage Km 82 127 River Vistula Chainage Km 82 909 With Linking Sections From Km 010 To Km 0 000 Linking Section From Km 0 000 To Km 0 934 Full Section Of The Embankment And From Km 0 934 To Km 0 939 Linking Section Working Chainage Section 3 2 Over A Length Of 4932M From Embankment S Register Chainage Km 82 149 River Vistula Chainage Km 82 931 To Embankment S Register Chainage Km 87 081 River Vistula Chainage Km 87 899 With A Linking Section From Km 0 953 To Km 0 956 Linking Section From 0 956 To Km 5 888 Full Section Of The Embankment Working Chainage Section 3 3 Over A Length Of 3424M From Embankment S Register Chainage Km 87 095 River Vistula Chainage Km 87 913 To Embankment S Register Chainage Km 90 519 River Vistula Chainage Km 92 150 From Working Chainage Km 5 902 To Working Chainage Km 9 326 Section 3 4 Over A Length Of 1352M From Embankment S Register Chainage Km 90 519 River Vistula Chainage 92 150 To Embankment S Register Chainage Km 91 850 River Vistula Chainage 92 800 From Working Chainage Km 9 326 To Working Chainage Km 10 678 Except For Redevelopment Of The Existing Embankments The Scope Of Works Comprises The Following Dismantling And Construction Of Culverts Construction Of New Pavement On The Crest Of The Embankment Made Of Gravel Mix And Broken Stone On Geofibre Construction And Reconstruction Of Service Roads And Pavement Hardened With Sand On Geofibre With Stone And Broken Stone Construction And Reconstruction Of Turnouts Extension Construction And Dismantling Of Existing Descent Roads And Crossings Reconstruction Of Utilities Steps On The Embankment Concrete Sidewalk Pile Wall Levelling Works Dismantling And Construction Of Fences Removal Of Trees And Shrubs
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 29699952
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.