Construction Work – Construction Of Hévíz Substation. Hévíz Substation Quantities: - 2 Relay Houses (With Installation And Mechanical Engineering): Gross 76 M2 - Concrete Paved Road: 2800 M2 - Fine Landscaping: 28000 M2 - 400 Kv Monolithic Reinforced Concrete Foundations With Steel Structure Exposure: 240 M3 - 132 Kv And Street Lighting Monolithic Reinforced Concrete Foundations With Steel Structure Exposure: 978 M3 - 18 Kv Monolithic Reinforced Concrete Foundations With Steel Structure Overhangs: 27 M3 - Construction Of An Oil Separation System, Construction Of Rainwater Drainage: 1 Oil Separator, 150 Fm Channel - Monolithic And Prefabricated Cable Channel: 470 Fm - Construction Of A 400 Kv Transformer Base (Amount Of Incorporated Concrete): 170 M3 - Substation Fence 475 Fm A The Fine Landscaping Of The Area Includes The Creation Of Drainage, Humustization In The Affected Area, And Weeding And Grass Care Up To The First Mowing (Including Mowing). Before Starting The Work, The Contractor Must Submit A Professionally Developed Technological Instruction (Tu), A Sampling And Qualification Plan (Mmt) And An Indicative Weekly Breakdown Schedule For All Work Processes. Work Cannot Be Started Without A Tu, Mmt And Schedule Approved By The Customer. The Client Cannot Accept A Deadline Slip On The Grounds That The Contractor Could Not Start Work In The Absence Of An Approved Tu+Mmt. The Daily Working Time Must Be Determined In Accordance With The Substation Service. The Final Completion Of The Fine Landscaping Will Be Possible After The Electrical Technology Has Been Installed. During Certain Periods Of The Work Processes, Specialists In Construction And Technological Installation Will Work In The Area At The Same Time. During These Periods, Works Can Be Carried Out With Regard To Each Other And With As Little Hindrance As Possible. During The Foundation Works, The Architects Tasks Must Be Performed Only Up To The Installation Of The Steel Structures To Be Concreted, The Production And Setting Of The Steel Structures Supporting The Device, The Columns With A Lattice Structure, And The Portals Are Not Part Of The Task. The Complete Construction Of The Building Is A Task, Including The Construction Of Building Mechanics And Electrical Installation. Only The Placement Of Protective Pipes Necessary For Property And Fire Protection Is Included In The Tender. There Are Equipment Under High Voltage Operating In The Area Of The Substation (Outside The Immediate Work Area). During Construction Work, Special Attention Must Be Paid To The Operating Equipment, Non-Compliance With The Relevant Regulations May Result In The Contractor Being Banned From The Area. During Construction, It May Happen That Previously Placed Utilities, Cables, And Grounding Nets Are Found In The Ground. The Operational Supervision May Request Manual Excavation Before The Start Of Earthworks. During Construction, Construction Water And Electricity Are Provided, However, Draining It To The Work Area Within The Substation And Protecting The Drain Is The Responsibility Of The Contractor. During Construction, The Excavated Soil That Cannot Be Backfilled Must Be Transported Immediately For On-Site Deposit
Contact Information
Contact No.
+36 202171718
Email
kovacs.judit1@mvm.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 103372148
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.