Work Detail Project Financed : ADB >107.57 m USD, IDB:220.00 m USD Project Duration : 60 Months Project Highlights: Gross Output: 389.40 MW Net Output: 380.68 MW CCGT Configuration: Single Shaft Completion Period: 38 Months Plant Life: 25 years Objective: a. To narrow the ever increasing gap between demand and supply of electricity through gas based low-cost generation in the north-east zone of the b. To meet up increasing power demand in the country by adding local generation. c. To increase the power generation through utilization of countrys natural gas country resources available nearest to the proposed power plant site with requisite pressure. d. To accelerate the economic development of the country by adequate and reliable power generation and to support the planned target of power demand. e. To overcome the present generation shortage by increasing generation and to minimize load shedding. f. To enhance the stability and reliability of the national grid system and reduce the transmission loss by local generation. g. To increase energy efficiency of power generation. Estimated cost of the project : Total: 293,136.39, GOB: 42,0868.53,PA: 235,828.02, APSCL: 15,239.84 Date of ICB floating: - Date of tender opening: - Notification of Award (NOA): - Notification of Award (NOA): - Acceptance of NOA: - Contract Agreement: - Contractor: Commencement of early works: Date of LC opening: Date of commencement: Date of completion: June, 2020 Commercial Operation Date: Project Director: Engr. Kshitish Chandra Biswas Physical Progress : International Tender Notice (1st Stage) published in international newspaper on 12th May 2016 for the selection of EPC contractor. Contract signed with M/S Poyry Switzerland Ltd, Switzerland & Atlanta Enterprise Limited, Bangladesh for Project Implementation Consultancy Service on last 29th March 2017. Invitation for Second Stage Bids was issued on 15th October 2017 to the short listed bidders. Financial Progress: 0.077%
Funded By 107
Country Bangladesh , Southern Asia
Project Value 29 Million

Work Detail

Project Financed : ADB >107.57 m USD, IDB:220.00 m USD Project Duration : 60 Months Project Highlights: Gross Output: 389.40 MW Net Output: 380.68 MW CCGT Configuration: Single Shaft Completion Period: 38 Months Plant Life: 25 years Objective: a. To narrow the ever increasing gap between demand and supply of electricity through gas based low-cost generation in the north-east zone of the b. To meet up increasing power demand in the country by adding local generation. c. To increase the power generation through utilization of countrys natural gas country resources available nearest to the proposed power plant site with requisite pressure. d. To accelerate the economic development of the country by adequate and reliable power generation and to support the planned target of power demand. e. To overcome the present generation shortage by increasing generation and to minimize load shedding. f. To enhance the stability and reliability of the national grid system and reduce the transmission loss by local generation. g. To increase energy efficiency of power generation. Estimated cost of the project : Total: 293,136.39, GOB: 42,0868.53,PA: 235,828.02, APSCL: 15,239.84 Date of ICB floating: - Date of tender opening: - Notification of Award (NOA): - Notification of Award (NOA): - Acceptance of NOA: - Contract Agreement: - Contractor: Commencement of early works: Date of LC opening: Date of commencement: Date of completion: June, 2020 Commercial Operation Date: Project Director: Engr. Kshitish Chandra Biswas Physical Progress : International Tender Notice (1st Stage) published in international newspaper on 12th May 2016 for the selection of EPC contractor. Contract signed with M/S Poyry Switzerland Ltd, Switzerland & Atlanta Enterprise Limited, Bangladesh for Project Implementation Consultancy Service on last 29th March 2017. Invitation for Second Stage Bids was issued on 15th October 2017 to the short listed bidders. Financial Progress: 0.077%

Key Dates

Project Date 30 Jun 2020

Contact Information

Project Name Ashuganj 400MW CCPP (East) Project
Address Navana Rahim Ardent (Level-8) 185 Shahid Syed Nazrul Islam Sarani (Old 39, Kakrail, Bijoy Nagar) Paltan, Dhaka Phone : +880-02-9330915 Fax : +880-02-9330918