Work Detail The Carrothers-Shelby Transmission Line Project involves rebuilding about 18 miles of 69-kilovolt (kV) transmission line in Crawford, Seneca and Richland counties. Updating the transmission line with modern equipment improves electric service reliability, reduces the likelihood of extended power outages and speeds recovery time when outages do occur. The majority of the line will be rebuilt within AEP Ohios existing right-of-way corridor. Additional or supplemental easements might be required in some areas along the line route to ensure the line meets current safety standards. The line will be built in a 50-foot wide right-of-way corridor, which is necessary to safely construct, operate and maintain the line. Existing wood poleand steelstructures will be replaced with steel single-polestructures that will be about 90-feet tall.
Funded By 0
Country United States , Northern America
Project Value 22 Million

Work Detail

The Carrothers-Shelby Transmission Line Project involves rebuilding about 18 miles of 69-kilovolt (kV) transmission line in Crawford, Seneca and Richland counties. Updating the transmission line with modern equipment improves electric service reliability, reduces the likelihood of extended power outages and speeds recovery time when outages do occur. The majority of the line will be rebuilt within AEP Ohios existing right-of-way corridor. Additional or supplemental easements might be required in some areas along the line route to ensure the line meets current safety standards. The line will be built in a 50-foot wide right-of-way corridor, which is necessary to safely construct, operate and maintain the line. Existing wood poleand steelstructures will be replaced with steel single-polestructures that will be about 90-feet tall.

Contact Information

Project Name Carrothers-Shelby Transmission Line Project
Address c/o Erin Miller 700 Morrison Road Gahanna, OH 43230 ecmiller1@aep.com (614) 552-1929

Top