Procurement Plan For Building Kim Lan Primary School Gia Lam DistrictDate Approval 11 09 2019Package 1Type ConsultancyName Package No 02 Consultancy On Design Of Feasibility Study And Construction Cost Estimates Of Fpf WorksPrice 25 389 000Package 2Type ConsultancyName Package No 03 Consultancy Design Bvtc Estimate Construction Works Items Of Substation ConstructionPrice 22 470 000Package 3Type ConsultancyName Package No 04 Consultancy For Bidding Document Preparation Bid Evaluation And Analysis Package No 01 Consultancy On Design Of Feasibility Study And Construction Cost Estimates Of Main Building Block And Outside Infrastructure Package No 05 Consultancy On Evaluation Of Bidding Documents And Result Of Selection Of Contractor Package No 01 Consultancy On Design Of Feasibility Study And Construction Cost Estimates Of Main Building Block And Outside Infrastructure Package No 06 Consultancy And Verification Of Design Drawings And Cost Estimates Of Main Building Blocks And Outside Infrastructure Package No 07 Consultancy On Design Verification Of Feasibility Study And Cost Estimation Of Transformer Station Construction Items Package No 01 Consultancy On Design Of Construction Plan And Construction Cost Estimates Of Main Building Block And Outside InfrastructurePrice 7 241 000Package 4Type ConsultancyName Package No 05 Consultancy On Evaluation Of Bidding Documents And Result Of Selection Of Contractor Package No 01 Consultancy On Design Of Feasibility Study And Construction Cost Estimates Of Main Building Block And Outside Infrastructure Package No 06 Consultancy And Verification Of Design Drawings And Cost Estimates Of Main Building Blocks And Outside Infrastructure Package No 07 Consultancy On Design Verification Of Feasibility Study And Cost Estimation Of Transformer Station Construction Items Package No 01 Consultancy On Design Of Construction Plan And Construction Cost Estimates Of Main Building Block And Outside InfrastructurePrice 2 100 000Package 5Type ConsultancyName Package No 06 Consultancy And Verification Of Design Drawings And Cost Estimates Of Main Building Blocks And Outside InfrastructurePrice 129 650 000Package 6Type ConsultancyName Package No 07 Consultancy On Design Verification Of Feasibility Study And Cost Estimation Of Transformer Station Construction ItemsPrice 4 830 000Package 7Type ConsultancyName Package No 01 Consultancy On Design Of Construction Plan And Construction Cost Estimates Of Main Building Block And Outside InfrastructurePrice 887 309 000 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 23033510
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.