Procurement Plan For Plan To Select A Contractor For The Survey Consultancy Package To Set Up The Construction Drawing Design The Total Cost Estimate And To Install The Ground Clearance Piles For The Construction Of Anti Landslide Embankment On The Banks Of Binh Lang Slot Hong Linh Town Section From Cau Doi To Bac Hong Lake And Section From Duc Thuan Bridge To Nha Le Canal Date Approval 11 09 2019Package 1Type ConsultancyName 02 Tv Consult Survey Set Up Construction Drawing Design Total Cost Estimation And Install Ground Clearance Piles To Construct Revetment Preventing Erosion Of Two Banks Of Binh Lang Slot Hong Linh Town Section From Cau Doi To Bac Hong Regulating Lake And Section From Duc Thuan Bridge To Nha Le Canal Price 1 022 885 000 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 23028524
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.