Contract Notice Aerial And Related ServicesCompensatory Liming In The District Of Landenhausen In The Winter Of 2019 2020 On Around 1 000 HaDescription Compensation Calcification In The Forest District Landenhausen On Approx 1 000 Ha In The Area South Of Wartenberg Angersbach And Wartenberg Landenhausenwith 3 T Magnesium Containing Lime Ha By Helicopter At The Earliest From 1 11 2019 Until 28 2 2020 At The Latestsee Also The Requirements According To The Hessian Leaflet 2019 On The Application For A Grant For Near Naturalforest Management Soil Protection Liming B4 Guideline For Forestry Promotion In Hesse Dated 30 3 2018 Vi 1 88 F 08 09 001 2017 And Regulation Eu No 1305 20131 Requirements For The Materialin Hesse Magnesium Bearing Limestones Must Always Be Applied Eg Carbonated Magnesium Lime With At Least 20 Mgco3 Higher Magnesium Levels Are Desired The Calcium Carbonate Magnesium Limes So Far Used In Hessen Contain Naturally Between 28 And 49 Mgc03 They Must Comply With The Requirements Of The German Fertilizer Ordinance D mv Residual Moisture In The Case Of Earth Moist Lime Independent Of The Type Of Application Maximum 4 The Relevant Notes In The Product Safety Data Sheet For The Use Of Carbonate Of Magnesium Lime Prepared In Accordance With Annex Ii Of The Reach Regulation Ec No 1907 2006 Regulation Ec No 1272 2008 And Regulation Eu No 453 2010 Must Be Observed 2 Landing Loading Placesthe Landing Sites Loading Areas For Soil Protection Liming Are To Be Kept So Clean That Larger Deposits Of Lime On Paths And Squares Are Avoided After The Completion Of The Measure The Storage Spaces Shall Be Prepared By The Contractor In Such A Way That The Use Of These Areas For Their Current Purpose Is Again Guaranteed Limestone Residues May Only Remain On The Storage Areas To An Extent That Does Not Affect The Use Of Adjacent Agricultural And Forestry Areas 3 To Be Observed A Surface Tolerance For The Limed Areas The Applied Quantities Of Lime On Subareas May Vary By A Maximum Of 30 By The Target Amount But Must Be Equal To The Target Amount Ie For A Control Measurement The Mean Value Of A Measuring Field Must Be In The Range 30 Of The Target Quantity B Point Tolerance One Third Of The Amount Of Lime That Hits The Surfaces Must Lie Between The Range Of The Target Dose 30 And At The Same Time Exceed Or Fall Short Of The Target Quantity By More Than 50 Ie In A Control Measurement One Third Of The Individual Measured Values Must Be Within One Measuring Field Within The Range Of The Setpoint 30 And A Maximum Of One Third Of The Individual Measured Values May Be Outside The Range Of The Setpoint 50 4 Execution Period Earliest 1 11 2019 Until 28 2 2020 At The Latest5 The Area Size Is Preliminary It Must Be Amended After The Availability Of Space Has Been Specified In The Permit Decision Of The Regierungspr sidium Darmstadt A Change In The Size Of The Area By 10 Is To Be Accepted Without This Leading To A Change In The Offer Per Ha Time Limit For Receipt Of Tenders Or Requests To Participate Date 22 10 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22971784
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.