Contract Notice Engineering ServicesObject Planning Friedrich Ebert RealschuleDescription Subject Of This Award Procedure Are Project Planning Services Based On The Hoai These Include Both Basic Services As Well As Special Services From The Scope Of Object Planning According To 34 Hoai Service Phases 3 To 9 The Exact Performance Picture And A Detailed Explanation Of The Planning Task As Well As Supplementary Documents Will Be Made Available To The Tenderers Selected For The Negotiated Procedure Together With The Request For The Submission Of An Offer The Services Are Ordered In Stages The Levels Being Defined As Follows Level 1 Draft Planning Performance Phase 3 According To 34 Hoai In Conjunction With Annex 1 To The Hoai Level 2 Approval Planning To Object Support Including Performance Phase 4 9 According To 34 Hoai In Conjunction With Annex 1 To The Hoai Concept For The Planning Services The Object Planning Is Up To And Including Lp 2 By The Client From Lp 3 The Object Planning Service Is To Be Provided By An External Office The Other Planning Services Are Provided Individually By Respective Offices There Is No General Planning The Planning Of The Cafeteria Kitchen Is Done By A Separate Specialist Planning Office Award Of Works The Construction Works Of The Extension Building Are Mainly To Be Awarded To A General Contractor With Construction Work Of All Trades And Planning Services From Lp 5 Onwards The Construction Work Of The Conversion In The Stock Should Be Carried Out In Individual Work Order Project Time For The Extension The Planning Phase Including The Tender Will Take Place From May 2019 The Tendered Property Planning Will Take Place From 12 2019 Until The End Of 2023 Construction Will Begin In March 2021 And End In April 2023 The Planning Phase Of The Renovation Of The Existing Building Is Accompanied By The Extension The Construction Work Begins After The Completion Of The Extension In April 2023 And Ends In July 2023 From A Very Ambitious Zeitl Construction Of The Reconstruction Measure Is Expected Requirements For Planning And Construction Supervision In Addition To The Usual Requirements Such As Sophisticated Planning Quality Good Coordination And Integration With The Other Planner Contributions Economic Planning Concepts And Planning Solutions As Well As Adherence To The Schedule Special Emphasis Is Placed On The Implementation Of Modern Pedagogical Learning Approaches Perfected Multifunctional Character Of The Auditorium Dining Area And Integration Interaction Between New Construction And Design Stock Areas Laid In Addition The Urban Integration And Design Of The New Structure Is A Challenge The Principle Of Sustainability And The Lowest Possible Consequential Costs Must Be Observed In The Planning Concept And The Quality Requirements For The Construction Products And Systems To Be Carried Out Ultimately Special Attention Must Be Paid To The Mature Tender Documents That Are Clearly Specified In The Service Specifications In Order To Prevent As Much As Possible The Additional Demands Of The Commissioned Contractors It Is Necessary To Prepare A Comprehensive And High Quality Tendering Plan Master Plan For The General Contractor Assignment Time Limit For Receipt Of Tenders Or Requests To Participate Date 07 10 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22538032
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.