Contract Notice Road Bridge Construction WorkNew Construction Of The Gahmenerstra e Bridge No 460 Dhk Km 12 973Description The Advertised Services Essentially Include One Steel Superstructure With Prestressed Concrete Deck Plate Total Weight Approx 480 T Incl Both Abutments Approx 350 M3 Of Reinforced Concrete Manufacture And Install Approx 500 T Steel Superstructure About 4 000 M2Steel Surface Intermediate Topcoat Produce Approx 750 M Of Steel Railing About 450 M3Produce Concrete And Reinforced Concrete For Deck Slab And Caps Install Approx 140 T Of Rebar For Deck Plate And Caps About 950 M3Producing Concrete And Reinforced Concrete For Abutments Install Approx 106 T Of Reinforcing Steel For Abutment Carry Out Approx 750 M Of Drilling Work For Pile Foundation About 850 M3Produce Concrete And Reinforced Concrete For Bored Piles Install Approx 68 T Of Reinforcing Steel For Bored Piles About 545 M2Verbauarbeiten About 305 M2Sheet Piling About 9 300 M3Utilization Of Excavated Soil About 4 500 M3Disposal Of Soil Excavation Z 2 Z2 According To Laga About 28 700 M3Deliver And Install The Floor About 6 800 M2Produce Asphalt Base And Cover Layer About 8 000 M2Road Crash Approx 1 520 T Disposal Of The Road Carbonaceous Time Limit For Receipt Of Tenders Or Requests To Participate Date 24 10 2019 Local Time 11 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22389247
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.