Contract Notice Sports Goods And EquipmentSlide Aqua SolDescription Stadtwerke Kempen Gmbh Operates The Aqua Sol As A Combined Indoor And Outdoor Pool At The Location Berliner Allee 53 In 47906 Kempen In The Area Of The Indoor Pool The Outdated Technology And The Building Envelope Are Discontinuous In Preliminary Investigations It Was Determined That These Can Not Be Economically Remedied It Is Therefore The New Construction Of A Swimming Pool As Well As The Renovation Of Various Function Rooms Entrance Brine Bath Sauna Planned In The Existing Outdoor Swimming Pool Is A Swimming Pool 50 X 21 M Available The New Construction Redevelopment Concept Plans To Use The 50 M Pool As The Foundation For The New Construction Of A Swimming Pool With 25 M Pool And A Multipurpose Pool 10 X 10 M Technology The Existing Treatment Technology Of The Indoor Pool Is Discontinued And Will Be Disassembled And Disposed Of In The Course Of The Franking Of The Building Schwimmhalle Alt For The Outdoor Pool An Intact And Well Maintained Pool Water Treatment Plant Is Available The Plant Is Set Up In A Technical Building At Springerbecken Due To The Omission Of The 50 M Pool In The Outdoor Pool Treatment Capacities Will Be Freed Here Which Are To Be Used For The Two Planned New Indoor Pools And The Slide Slide System For The Bathroom Is Provided A New Large Slide With Integrated Landing Pool As An Option The Extension Is Planned For An Additional Slide This Can Be Done By Moving The Old Slide Out Of Stock Or Installing A New Slide At A Later Date The Operating Water Of The Chutes Is Processed In The Circuit Wk1 For The Slides Is A Surcharge Of 70 M3 H Provided The Chute Water Is Removed From A Buffer And Conveyed By Pumps To The Starting Point Of The Chute The Water Runs Into A Shallow Spout Via The Chutes And From There Back Into The Intermediate Container From The Intermediate Container Will Be 70 M3 H Conveyed Via An Additional Raw Water Pump In The Surge Tank Wk1 From The Pure Water Volume Flow Wk1 A Partial Flow Is Introduced Into The Intermediate Container The Partial Flow Is Regulated Separately And Exposed To Chlorine Chlorination The Supply Of Chlorine And Disinfection Of The Bath Water Is Carried Out Via The Existing Chlorine Gas Dosing System The Storage Tank Chute Is Given A Separate Chlo Ding By The Bathwater Section Time Limit For Receipt Of Tenders Or Requests To Participate Date 30 10 2019 Local Time 14 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22298493
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.