Contract Notice Construction Work For Pipelines Communication And Power LinesFramework Agreement On Annual Construction WorkDescription Provision Of Construction Works Within The Framework Of An Annual Service List Including On Call Service Construction Services For Urban Network Extensions Of Drinking Water Pipes These Are Exclusively New Development Areas In Open Terrain As A Rule The Contractor Is Commissioned To Lay The Main Water Pipeline The Following Services Must Be Provided Earthworks Shoring Road Construction And Roadworks Drainage And Pipe Construction In The Case Of Urban Renewal Work Existing Main Pipelines And Service Connections Must Be Replaced By Completely New Pipelines In Built Up Local Or Urban Areas These Works Are Often I V M Road Or Canal Renewals Executed The Road And Canal Works Are Then Undertaken By The Towns Or Municipalities Here The Construction Process Is To Be Coordinated With The Road Construction Companies Due To The Process The Provision Of Services In Subsections Must Be Expected As Far As A Renewal Of The Drinking Water Pipes Are Necessary Also The Necessary Surface Work Is Added In General The Following Services Are To Be Provided Earthworks Shoring Road Construction And Road Construction Work Drainage Shell Mauerdurchbruch And Core Drilling When Renovating Existing Installations Fittings Such As Gate Valves And Hydrants Must Be Exchanged At The Clients Supply Facilities Collective Orders Of At Least 5 Construction Pits Are Granted As Individual Orders But Only For One Association Municipality The Work Includes The Complete Design With Road And Pipeline Construction In General The Following Services Are To Be Provided Earthworks Shoring Road Construction And Road Construction And Body Work The Damage Removal Work Involves Repairing Pipe Bursts Throughout The Service Area During Normal And Off Duty Hours Depending On The Job Order The Works Include The Complete Execution Of Road Earth And Repair Work In General The Following Services Are To Be Provided Earthworks Shoring Road Construction And Road Construction And Body Work Call Clearance For The Elimination Of Damage To Drinking Water Supply Lines Includes Repairing Pipe Bursts And Other Damage Throughout The Association Area During Weekends From Saturday To Sunday From 7 00 Am To 4 00 Pm And For The Period Between Christmas Through New Year Or On Public Holidays As A Rule The Same Construction Work Is Required As For The Removal Of Damage During Normal Service In Addition There Are The Construction Site Facilities Traffic Safety Measures And Separate Hourly Wage Work Time Limit For Receipt Of Tenders Or Requests To Participate Date 23 09 2019 Local Time 23 59 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22185484
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.