Periodic Indicative Notice Without Call For Competition Static Barrage Construction WorkReplacement New Pumping Station And Ohrewehr Satuelle Lot 2 Pumping Station And OhrewehrDescription Part 1 Pumping Station The Main Equipment Is 3 Pumps 2 Of Them With 6 Kv Voltage Level Emsr Technology With 3 New Transformers For A Total Of 2400 Kva Medium And Low Voltage Switchgear 16 Cabinets Internal And External Lightning Protection Automation And Telecontrol Horizontal Screens And Screen Belt Systems As Fine Screens With Fish Return System For Fish Protection Dimensions Excavation 50 M X 17 M Made Of Sheet Piles Length Up To 10 M Total Area 1 100 M2 With Sealing Sole 0 8 M Lower Edge Approx 9 5 M U Gok Dimensions Pumping Unit Made Of Reinforced Concrete Approx 27 M X 15 M X 7 M About 1 000 M3Reinforced Concrete Separate E Building 520 M Gfrp Pressure Pipe Dn 1200 Exterior Facilities Access Road And Paved Areas In Asphalt Concrete Construction 2 800 M2 Plant Planning Technical Equipment Specifications Control Cabinet Design Plans Circuit Diagrams Building Surveying Trial Operation Documentation Monitoring Of Fish Protection Technology By Publicly Appointed And Sworn Experts The Following Services Essentially Include Demolition And Dismantling Works Sewer Shoring Piling And Press Fitting Work Earthworks Dewatering Open Dewatering Closed Groundwater Scaffolding Work Concrete And Reinforced Concrete Works Metalworking Facing Masonry Including Insulation Roofing And Roof Drainage Masonry And Plaster Work Screed And Floor Coating Works Tile And Plate Works Sanitary Installation Drainage Channel Works Roads And Paved Areas Buried Cables Channels And Lines Outdoor Facilities Hydraulic Works Piping Piping Technology Fittings Drives Pumps Aggregates Hydrophor Technological Metrology Basic Equipment Tests Evidence Buried Penstocks Emsr Technology Horizontal Screen Siebbandanlage With Fischr ckf hrungssytem Loading Crane Remote Data Transmission And Automation Technology Functional Tests Commissioning Trial Operation Part 2 Ohrewehr The Subject Matter Is The Production Of A New Weir System Reinforced Concrete Dam With 3 Weir Fields And 3 Protection Boards With 5 M Length Each Overall Length Approx 26 M Storage Height Approx 1 5 M Equipment With Fish Belly Flap The Following Services Essentially Include Demolition Existing Weir System Excavation Of Steel Sheet Piles Bypass For The Ear Of Steel Sheet Piles Lowering Of Groundwater Actuators For The Equipment With Emsr Technology Manufacture Of Reinforced Concrete Fish Ladder Clear Width 2 7 M Length 27 M Average Height 2 6 M Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22150305
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.