Contract Notice Construction Work For Pipelines Communication And Power LinesVe 4 07 Abwasser Wasser Gasanlage ODescription The Drinking Water Supply For The Building Is Arranged In The Technical Room Ha Room A Cold Water Meter A Backwashable Filter As Well As The Required Shut Off Valves Are Installed In The Service Line In The Service Connection The Supply Takes Place From The Basement Level Via A Central Climbing Point The Stations In The Ec Are Supplied Via Horizontal Distribution Lines In Suspended Ceilings The Line System Is Executed Without Terminal Stagnation Sections Single Connection Lines The Floor Distribution Pipes Are Routed Via Flow Dividers To The Extraction Points And Terminate At Regularly Used Extraction Points The Hot Water System Is Circulated To The Extraction Points Hydraulic Balancing On The Main Lines Is Done With Thermostatic Regulating Valves Shut Off Valves Are Only Provided Where They Are Indispensable Room Wise Shut Off Valves Are Not Provided The Wall Fittings Get Lockable Angle Valves The Complete Drinking Water System Is Designed In Stainless Steel Pipe With Press Connection Technology For Drinking Water Installation According To Din 1988 Cold Water And Hot Water Pipes Are Insulated According To Enev And Din 1988 Insulation With Metal Jacket Protection Is Not Provided The Drinking Water Heating System Is Designed As A Heat Exchanger Station With A Plate Heat Exchanger A Charging And Circulation Pump Dirt And Rain Water Are Routed In Separate Piping Systems There Are No Internal Rainwater Pipes Over Soundproofed Pp Pe Pipelines Horizontal And Vertical Manifolds Are Used In On Site Pre Wall Constructions And In Suspended Dec In Technical And Storage Rooms Cables Are Laid Visibly Corresponding Inspection Openings Are Provided The Waste Water Downpipes Receive Cleaning Openings At The Foot Points And Are Fastened With Commercially Available Brackets Ventilation Takes Place At Calculated And Coordinated Locations Above The Roof The Ventilation Hoods Are Mounted On Site The Drainage Of The Sanitary Objects Is Carried Out Above The Flood Level In The Free Fall All Fire Protection Bushings Are Upgraded To The Required Quality Time Limit For Receipt Of Tenders Or Requests To Participate Date 27 09 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22150060
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.