Contract Notice Road Construction WorksExpansion Of The Volmetalbahn B Bautechnik Tiefbau B s Km 31 026 And 31 337Description Cable Civil Engineering Signal Locations 2 Pc Work Platform For Signal Location Large Design With Expansion Module 1 Pc Working Platform For Signal Location Small Design With Expansion Module Cable Trays 19 M Concrete Cable Channel Size I I F 1 Pc Cable Laying Box Size Ii Including Manhole Connection Kit 1 Pc Cable Tray Size Iii Including Manhole Connection Kit 8 Pcs Core Drilling Up To Dn 150 7 St Surround Frames For Beacons And Het Locations 2 Pieces Of Prestressed Concrete Posts 2 80 M 4 Reinforced Concrete Posts 4 0 M Crossings 12 M Open Undercrossing Of Tracks 1 Cable Protection Pipes Dn 110 5 M Open Undercrossing Of Tracks 3 Cable Protection Pipes Dn 110 Foundations 2 St B Switchyard 4 X Precast Foundation 1 St Rammrohrgr ndung To 3 M Depth 4 Concrete Foundations Large Design Up To 1 70 M Depth 7 Concrete Foundations Small Design Up To 2 M Depth Cable Laying 110 M Prev Hold Cable Up To 25 Mm Lay 100 M Cable Up To 25 Mm In Cable Duct Lay 503 M Of Cable Up To 25 Mm In Conduit Pipe Routing Superstructure Road Construction Install 10 M Track Base Plates Stelcon Install 6 Track Track Inno Strail Produce 30 M Control Profile 107 M2Foundation Sole B Sh 1 201 M2Foundations Road Sidewalk 2 Pcs Entrance Platform B Switchboard Remove 149 M Topsoil Store Temporarily 320 M Construction Pit Excavation 58 M Soil Replacement 1 138 M2Frost Protection Layer 139 M2Crushed Stone Base 87 M2Topcoat According To Rlw 1027 M2Asphalt Base 372 M2Asphalt Binder 1 021 M2Asphalt Surface 64 M2Pavement Fixing 18 M2Paving Make 201 M Shelves Produce 62 M On Board Trough 444 M2Grassing 218 M Banquet 405 M2Break Asphalt Break Up 121 M Of Unbound Base Courses Drainage 45 M Connecting Cable Dn 150 2 Hours On The Street Make 64 M Of Lawn 35 M Partial Seepage Pipe Dn 100 Pe Hd Remove 11 M Of Drainage Channel Install 14 M Drainage Channel With Connection Dn 150 3 M Domestic Equipments 425 M Mark 6 Pcs Arrows 14 Traffic Signs 22 M Guardrail Remove 16 M Of Protective Device Make 4 Pcs Protective Device Aek Make 6 M Attachment Railing 12 M In Front Pick Up The Fence And Restore It To A New Location Including Gate 63 M Fence Made Of Steel Lattice Mats With Gate And Height Graduations Height 2 M 40 M Fence Made Of Steel Lattice Mats With Gate And Height Graduations Height 1 2 M Put 3 Street Lights On 1 Hydrant Disposal 110 T Soil Laga Z1 1 Z 1 2 127 T Soil Laga Z2 134 T Concrete Demolition 174 T Of Reclaimed Asphalt Power Supply Take 33 M Of Existing Cable 2 St Zas B 2 Pcs Grounding Open Close 20 M Cable Trough 170 M Cable Lay Time Limit For Receipt Of Tenders Or Requests To Participate Date 02 09 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21748933
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.