Prior Information Notice Without Call For Competition Sludge Drier InstallationPlanning Of The Execution And Construction Of A Sludge Drying Plant Including All Necessary Ancillary Facilities And Connection To The Existing Sewage Sludge Incineration Plant Description The Sewage Sludge Incineration Plant Which Has Been Operated By Innovatherm Since 1997 Represents A Plant According To The 4Th Bimschv Section 8 1 1 1 And Is Subject To The Provisions Of The 17Th Bimschv In The Sense Of The Abfkl rv It Represents A Pretreatment For Phosphorus Recovery In Order To Be Able To Achieve The Required Phosphorus Recovery Rates In The Future The Current Heating Value Increase Of Sewage Sludge Should Be Avoided By Adding Coal And A Sewage Sludge Drying Plant Installed At The Site It Is State Of The Art To Increase The Calorific Value Of The Sewage Sludge By Partial Drying To The Extent That A Self Existing Combustion Process Is Ensured Even Without Additives The Planned Drying Capacities Are Therefore To Ensure In The Final Stage That The Innovatherm Can Continue To Realize Full Utilization Of The Incinerator Even If Only Mechanically Dewatered Sewage Sludge Is Used On The Basis Of Specific Location Factors A Pre Selection And Determination Of Individual Process And Process Steps Has Already Been Carried Out Which In Addition To The Suitable Drying Process Also Consider Practice Proven Methods For Vapor Condensate Treatment And Exhaust Air Treatment In Order To Comply With Legal Requirements With Regard To Pollution Control And Plant Safety A Conveyor System Based On Belt Conveyors Ensures The Transport Of The Partially Dried Sewage Sludge From The New Drying Plant To The Existing Incinerator The Overall System Concept Also Includes The Thermo Technical Connection Of The Dryer System To The Existing Water Steam Circuit Of The Innovatherm Power Plant The Construction Of A Water Treatment Plant Demineralization Plant For Boiler Feed Water The Replacement Of The Existing Wet Cooling Tower By Adiabatic Dry Coolers And The Connection Of The New And The Existing Cooling Water Circuit To The New Radiator Whether The Adiabatic Dry Coolers Will Be Realized In The First Stage Or The Existing Wet Cooling Tower Will Continue To Operate Depends On The Result Of The Economic Evaluation Of The Offers As Part Of The Construction Of The Drying Plant It Is The Responsibility Of The Contractor To Clarify All Resulting Interfaces Process Engineering Electrical And Control Technology And Construction Between The Existing Incinerator And The New Drying Plant And Provide A Technically Viable Solution So That A Continuous Operation Of Both Systems Over An Operating Time Of 8 000 H A The Construction Of The Drying Plant And The Work Connected To The Incineration Plant Must Not Lead To Any Lasting Damage To The Disposal Operation Of Innovatherm During The Construction Period Work That Requires The Stoppage Of The Incinerator Must Be Planned And Carried Out In Such A Way That The Annual Revision Time Of 3 Weeks Can Be Used If Necessary Transitional Solutions Such B Schedule Provisional Water Treatment Or Sand Supply Commissioning Of The Plant Is Scheduled For June 2021 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21309325
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.