Tenders Are Invited For Supply And Install Piping System And Diffuser Replacement Works For Northern Region 1 0To Do Diffuser Pipe Works At Stp 1 General And Safety Requirements Allow For The Compliance To Osha 94 Fma 67 And Statutory Requirements As To Ensure The Safety Health And Welfare Of Persons At Work And Public Protection Arising From The Works 2 Health Safety Support Requirements Allow For Compliance With Indah Water Konsortium Operational Instruction Opi Requirements Allow For The Provision Of Safety And Health Practitioner Officer 3 Allow For The Use Of Adequate Personal Protective Equipment Ppe Such As Safety Helmets Safety Boots Eye Protectors Ear Protectors Gloves Fluorescent Jackets Etc To All Contractors Site Personnel 5 To Provide Colour Photographs For Progress Of Work Before During And After Note A Duration Of Work 90 Days B 5 Will Be Deducted For Any Delays Based On The Completion Of Works Upon Receive Po C Works Carried Out Should Not Be Any Hindrance To Others E All Hacking Work Are To Be Touch Up As Per Original Condition Level0 00010 0To Install Fine Bubble Diffuser Rate To Include Labor All Neccesary Fittings Thread Modification Involve During Installation Of The Diffuser Contractor Also To Provide Ss Fitting Suitable To The Diffuser Slot 0 00010 001Install Fine Bubble Diffuser No1 00011 0To Supply Competent Person For Working In Confine Space Authorised Entrance And Authorise Gas Tester Supply All Necessary Dewatering And Pumping Equipment And To Empty Aeration Tank Rate Shall Inclusive To Comply All Statutory Requirement For Working In Confine Space Area As Stipulated In Osha 94 Fma97 And Opi 009 2 0 00011 001Dewatering Works 1000 2500 M No1 00011 002Dewatering Works 2501 4500 M No1 00011 003Dewatering Works 4501 9000 M No1 00011 004Dewatering Works 9001 13500 M No1 00011 005Dewatering Works 13501 18000 M No1 00011 006Dewatering Works 18001 22500 M No1 00012 00 00012 001To Constuct Opening For Air Drop Pipe Complete With Frp Grating C W Frame For Aeration Tank Size 1M X 1M Rate Inclusive Providing Hinges Each Frp 1Inch Center To Center Of Each Frp Plate Rate Also Inclusive Hacking Resurface Of Hacked Concrete For Proper Finishing No1 00012 002To Dismantle And Dispose The Existing Piping Diffuser Lot1 00013 00 00013 001Transportation Cost For Northern RegionLot1 0002 0To Supply And Install G I Main Air Pipe Starting From The Blower Room To Aeration Tank End Cap And Completed With Epoxy Coated Paint Connection Pipe Less Than 6 Are Welding And More That 6 Use Flange Rate To Include All Modification And Fitting Required To Complete The Installation 0 0002 001Supply And Install G I Main Air Pipe Size 2 Starting From The Blower Room To Aeration TankM1 0002 002Supply And Install G I Main Air Pipe 3 Starting From The Blower Room To Aeration TankM1 0002 003Supply And Install G I Main Air Pipe 4 Starting From The Blower Room To Aeration TankM1 0002 004Supply And Install G I Main Air Pipe 6 Starting From The Blower Room To Aeration TankM1 0002 005Supply And Install G I Main Air Pipe 8 Starting From The Blower Room To Aeration TankM1 0002 006Supply And Install G I Main Air Pipe 10 Starting From The Blower Room To Aeration TankM1 0002 007Supply And Install G I Main Air Pipe 12 Starting From The Blower Room To Aeration TankM1 0002 008Supply And Install G I Main Air Pipe 14 Starting From The Blower Room To Aeration TankM1 0002 009Supply And Install G I Main Air Pipe 16 Starting From The Blower Room To Aeration TankM1 0003 0To Supply And Install G I Drop Pipe Starting From The Main Air Pipe To Aeration Tank End Cap And Completed With Epoxy Coated Paint Connection Pipe Less Than 6 Are Welding And More That 6 Use Flange Rate To Include All Modification And Fitting Required To Complete The Installation 0 0003 001Supply And Install G I Drop Pipe Size 1 Starting From The Main Air Pipe To Aeration TankM1 0003 002Supply And Install G I Drop Pipe Size 1 1 4 Starting From The Main Air Pipe To Aeration TankM1 0003 003Supply And Install G I Drop Pipe Size 1 1 2 Starting From The Main Air Pipe To Aeration Tank M1 0003 004Supply And Install G I Drop Pipe Size 2 Starting From The Main Air Pipe To Aeration TankM1 0003 005Supply And Install G I Drop Pipe Size 2 1 2 Starting From The Main Air Pipe To Aeration TankM1 0003 006Supply And Install G I Drop Pipe Size 3 Starting From The Main Air Pipe To Aeration TankM1 0003 007Supply And Install G I Drop Pipe Size 4 Starting From The Main Air Pipe To Aeration TankM1 0003 008Supply And Install G I Drop Pipe Size 6 Starting From The Main Air Pipe To Aeration TankM1 0003 009Supply And Install G I Drop Pipe Size 8 Starting From The Main Air Pipe To Aeration TankM1 0004 0To Supply And Install G I Aeration Pipe Starting From The Drop Pipe To Aeration Tank End Cap And Completed With Epoxy Coated Paint Connection Pipe Less Than 6 Are Welding And More That 6 Use Flange Rate To Include All Modification And Fitting Required To Complete The Installation 0 0004 001Supply And Install G I Aeration Pipe 2 Starting From The Drop Pipe To Aeration TankM1 0004 002Supply And Install G I Aeration Pipe 3 Starting From The Drop Pipe To Aeration TankM1 0004 003Supply And Install G I Aeration Pipe 4 Starting From The Drop Pipe To Aeration TankM1 0004 004Supply And Install G I Aeration Pipe 6 Starting From The Drop Pipe To Aeration TankM1 0005 0To Supply And Install G I Tee Pipe Fittings For Each Aeration Pipeline Rate To Include All Modification And Fitting Required To Complete The Installation 0 0005 001Supply And Install G I Tee Pipe Fittings Size 2No1 0005 002Supply And Install G I Tee Pipe Fittings Size 3No1 0005 003Supply And Install G I Tee Pipe Fittings Size 4No1 0005 004Supply And Install G I Tee Pipe Fittings Size 6No1 0006 0To Supply And Install G I Elbow Pipe Fittings For Each Aeration Pipeline Rate To Include All Modification And Fitting Required To Complete The Installation 0 0006 001Supply And Install G I Elbow Pipe Fittings Size 2No1 0006 002Supply And Install G I Elbow Pipe Fittings Size 3No1 0006 003Supply And Install G I Elbow Pipe Fittings Size 4No1 0006 004Supply And Install G I Elbow Pipe Fittings Size 6No1 0007 0To Supply And Install G I Pipe Support Complete With Ss Uclamp Epoxy Coated Paint Rate To Include All Modification And Fitting Required To Complete The Installation As Per Sketch Will Be Given To During Site Visit 0 0007 001Supply And Install G I Pipe Support 2 Complete With Ss Uclamp Epoxy Coated PaintNo1 0007 002Supply And Install G I Pipe Support 2 1 2 Complete With Ss Uclamp Epoxy Coated PaintNo1 0007 003Supply And Install G I Pipe Support 3 Complete With Ss Uclamp Epoxy Coated PaintNo1 0007 004Supply And Install G I Pipe Support 4 Complete With Ss Uclamp Epoxy Coated PaintNo1 0007 005Supply And Install G I Pipe Support 6 Complete With Ss Uclamp Epoxy Coated PaintNo1 0007 006Supply And Install G I Pipe Support 8 Complete With Ss Uclamp Epoxy Coated PaintNo1 0007 007Supply And Install G I Pipe Support 10 Complete With Ss Uclamp Epoxy Coated PaintNo1 0007 008Supply And Install G I Pipe Support 12 Complete With Ss Uclamp Epoxy Coated PaintNo1 0008 0To Supply And Install Butterfly Valve For Each Air Drop Aeration Pipeline C W Flanges Bolt And Nut0 0008 001Supply And Install Butterfly Valve C W Flanges Bolt And Nut 2No1 0008 002Supply And Install Butterfly Valve C W Flanges Bolt And Nut 2 1 2No1 0008 003Supply And Install Butterfly Valve C W Flanges Bolt And Nut 3No1 0008 004Supply And Install Butterfly Valve C W Flanges Bolt And Nut 4No1 0008 005Supply And Install Butterfly Valve C W Flanges Bolt And Nut 6No1 0008 006Supply And Install Butterfly Valve C W Flanges Bolt And Nut 8No1 0009 0To Supply Labor Tools And Material To Fabricate And Install G I Air Bleed Pipeworks And Control Valves I E Ball Valve For Discharge Of Condensate For Each Pipe Looping Rate Inclusive Of All Materials Fittings Valves And Whatever Thereof 0 0009 001Supply And Install G I Air Bleed Pipework Air Release Valve 3 4M1 0009 002Supply And Install G I Air Bleed Pipework Air Release Valve 1M1 0009 003Supply And Install G I Air Bleed Pipework Air Release Valve 1 1 2
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21274794
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.