Contract Notice Installation Work Of Refrigeration EquipmentRefrigeration Systems Federal Highway 57Description At The Height Of The Elbow Junction The Building Is Reduced By Two Storeys Whereby The Entire Structure Is Optically Divided Into Two Parts The East Facing Building At The Intersection Serves As The Main Entrance Building With A Building High Atrium For The Main Development And Contains Predominantly Administration Office Space As Well As Cafeteria And Lecture Rooms The Western Compact And Orthogonal Structure Which Also Partly Has 2 Basement Floors Contains Predominantly Laboratory And Research Rooms Here Refrigeration Systems The Performance Includes The Continuation And Completion Of The Refrigeration System In The Office And Laboratory Area In Some Areas An Existing Partial Installation Must Be Integrated Into The System To Be Constructed These Partial Installations Must Be Checked To Ensure That The Warranty Has Been Taken Over Participation In The Once Weekly Planning Meeting By Qualified Personnel Is A Binding Part Of The Service On The Obligation Gem Vob B Ag Side At Any Time To Provide Sufficiently Competent Personnel Is Expressly Advised For The Operation Of The Building Cooling Energy Is Provided For The Partial Air Conditioners And Circulating Air Cooling Units Refrigeration Is Provided By Water Cooled Chillers There Are 4 Chillers Installed Refrigeration Is Provided With Sufficiently Low Outside Temperatures Via Free Cooling With Outside Air In Conjunction With The Recoolers The Heat Is Transferred From The Chillers To The Environment Via 4 Recoolers The Heat Transfer Medium In The Piping System For The Cooling Water Is Treated Water According To Vdi2035 With The Addition Of Antifreeze Softening The Hybrid Coolers Uses Softened Or Deionized Water The Hybrid Coolers Are Placed On The Roof The Piping Material Used Is Predominantly Seamless Boar Pipes According To Din En 10220 And Din En 10255 With An Industrially Applied Double Corrosion Protection Coating The Pipes Are Fastened With Suitable Cold Clamps The Insulation Is Made With Diffusion Proof Material And Is Carried Out By The Customer For Execution Are 3 Refrigeration Systems 2 Redundant Chillers Each With 130 Kw Supply About 45 Coolers As Well As About 20 Process Refrigeration Systems A 540 Kw Chiller Supplies Approx 28 Coolers With Cold Water And A 650 Kw Chiller Supplies Approx 100 Circulating Air Coolers With Cold Water Time Limit For Receipt Of Tenders Or Requests To Participate Date 07 08 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21261506
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.