Contract Notice Structural Shell WorkNew Ramp Building Hall 6Description The New Logistics Ramp Has A Total Length Of About 64 M The Ramp Can Be Divided Into Two Sections The Initial Area Is An Abutment With Piles Of 21 M Length A Three Span Bridge Construction With A Length Of 44 M Finally Leads To The Existing Bridge Bridge Over The Db Ag Approach The Individual Support Widths Are 13 5 M 15 5 M 13 M The Length Of The Overhang In The Connection Area Is 2 M In Plan The Ramp Initially Runs In A Circular Arc And Then Follows In The Area Of The Actual Bridge Structure Of A Straight Line The Static Precalculation Takes Into Account The Gradient The Maximum Longitudinal Inclination Is 12 5 The Superstructure Consists Of A Slack Reinforced Reinforced Concrete Slab With A Constant Height Of 0 7 M The Superstructure Width Is 6 5 M In The Connection Area The Superstructure Expands To 13M This Also Corresponds To The Length Of The Transitional Construction The Pillars Are Round Pillars With A Diameter Of 1 2 M The Height Of The Pillars Is Variable The Piers Are Also Founded On Bored Piles The Selected Bridge Equipment Bearings Transitional Structures Drainage Railing Sealing And Coverings Corresponds To The State Of The Art Effect Lighting Of The Ramp Structure Is Provided By The Led Luminaires Integrated In The Concrete Balustrade Elements Time Limit For Receipt Of Tenders Or Requests To Participate Date 12 08 2019 Local Time 11 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21187324
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.