Prior Information Notice Without Call For Competition Road Bridge Construction WorkReplacement New Barrage Steinhavel Lot 1 Access Roads And Culvert ConstructionDescription The Wna Berlin Plans The Replacement Of The New Lock Adjustment Of The Harbors Replacement Of The New Weir New Construction Of A Roadway Including Crossing Construction And The Construction Of A Fish Ladder And The Construction Of A New Plant To Overcome The Gradient For Muscle Powered Pleasure Craft The Construction Of The Project Is Divided Into 3 Lots Lot 1 Access Including Passage Structurelot 2 Vorh fenlot 3 Lock Weir Faa And Boat Passthe Erection Of The Culvert Construction The Construction Time Driveway As Well As The Associated Landscape Protection And Landscaping Measures Are The Subject Of This Tender Document Lot 1 A New Access Road Will Be Built Opening Up The Barrage From The North The Total Length Is About 160 M To The Bridge Structure In Order To Obtain A Navigable Access To The Sluice Island A Crossing Construction Is To Be Erected Above The M hlgraben Performances To Be Performedgeneral Technical Processing Implementation Planning And Preparation Of Inventory Documents Construction Site Equipment And Construction Aids Produce Media Race Cable Laying And Shafts Laying Of Drinking Water Pipeline Dn 63 In The Horizontal Flush Drilling Process Landscape Conservation Work Preliminary Work Clearing Of Construction Site Clearing Of 146 Woody Plants Vegetation Technical Work Topsoil Protection Approx 2 900 M2 Tree Protection Vegetation Protection Fence Length 470 M If Necessary Individual Tree Protection Conservation Of Species Protection Against Amphibians Length 120 M Embezzlement Of Breeding Birds Production Of The Access Road About 1 200 M3Soil Removal And Excavation And Z T Disposal Deliver Installation Of About 800 M2Geotextile Geogrid Delivery And Installation Of 1 400 M3Non Cohesive Filling Soil About 1 900 M2Produce And Compact Planum About 390 M3Producing And Compacting The Schott Yield Layer Producing The Through Flow Structure Install Maintain And Dismantle Approx 120 M Of Construction Time Trench Piping Dn 1200 About 1 200 M3Delivery Installation And Compaction Of Non Cohesive Material For Backfilling Wehrarm Steinhavel Nord About 550 M2Create Temporary Working Plane Ev2 80 Mn M2 About 150 M2Cut Over Bored Pile Wall 88 Cm About 50 M2Manufacture Hold And Dismantle The Scaffold About 55 M3Producing Reinforced Concrete For Passage Structure About 50 M2Bridge Decking Seal Protective Layer Wear Layer Pre Drill Approx 100 M Of Road Deliver Approx 200 T Steel Sheet Piling U Profile S 270 Ca 1 070 M2Bring Steel Sheet Pile Make About 70 M Holmgurt Steel Dismantling Trench Piping And Wehrarmverf llung After Completion Passage About 250 M2Make Sole Securing Underwater Produce And Assemble Approx 15 M Steel Fill Bar Railing Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21038286
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.