Contract Notice Repair And Maintenance ServicesPost Warranty Maintenance Of A Post War Security System Built In The Mma And Its Subordinate Structures In The CountryDescription The Post Warranty Post Warranty Service Includes Post Warranty Maintenance Of A Post War Security System Built At The Military Air Force Sofia And Subordinate Structures In The Country Including Labor Spare Parts And Specialized Technical Personnel For 24 Hour Monitoring Control And Management Security System Check The Control Panel Memory For Triggers And Malfunctions Visual Inspection And Verification Of The Proper Functioning Of The Sensors Clean The Lenses Of The Volumetric Detectors If The Pollution Is Detected Visual Inspection And Verification Of The Proper Functioning Of Keyboards Check The Operation Of The Panic Buttons Check The Condition Of The Power Supply Units And Rechargeable Batteries Check The Proper Functioning Of The Radio Transmitters Database Optimization And Access Control Software Settings Check The Readiness Of Readers For Access Control Check The Condition And Proper Operation Of Access Control Locks Checking The State Of Cctv In Different Modes Of Operation Including Reading Records Check The Overall Functioning Of Video Surveillance And Their Settings Check The Condition And Clean The Exterior Mounting Cases And The Camera Lenses Verification Of Camera Settings And Positioning With Respect To Surveillance Zones Checking The Status And Testing Of Motorized Dome Cameras And Control Elements To Control Them In Different Modes Of Operation View And Check Camera Power Supplies Review And Check Uninterruptible Power Supply Ups Status For Central Cctv Check The Status Of Control Panels And Their Memory For Triggers And Malfunctions Cleaning Of Smoke Detectors When Dust Is Found Testing Of Automatic And Manual Fire Detectors Check The Condition And Operation Of The Sound And Light Signaling Elements Remedying Damage Replacement If Necessary Of Spare Parts And Components New Original Unused And Not Recycled Monthly Activities Are Scheduled According To Days And Hours Agreed Between The Contractor And The Assignor The Contractor Shall Strictly Comply With The Manufacturers Instructions For The Security System Referred To In Paragraph 1 Of This Section The Contractor Shall Advise The Assignor On Any Matter Related To The Technical Operation Of The Security SystemTime Limit For Receipt Of Tenders Or Requests To Participate Date 30 07 2019 Local Time 16 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21000991
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.