Contract Notice Track Construction WorksNew Railway Bridge Kattwyk Ve05c Track Superstructure Harbor RailwayDescription The Hamburg Port Authority Is Currently Constructing The Port Railway For The Crossing Of The S derelbe The New Kattwyk Railway Bridge In The Form Of A Double Track Lifting Bridge North Of The Existing Kattwyk Bridge In This Context An Increase Of The Gradient Is Necessary On The Eastern Side Of The Country Hohe Schaar Area To Raise The Gradient A Retaining Wall Bw 225 Is Required To Secure The Terrain Jump For The Planned Route A Subsoil Improvement Is Planned In Addition With Approaches The New Railway Bridge Kattwyk A Twin Rail Extension Of The Port Railway Tracks With A Modified Route Planned In Essence The Present Call For Tenders Includes The Following Works Dismantling Of Existing Track Systems G01 New Track Construction G01 Earthworks And Civil Engineering Works G01 Cable Foundation G01 Installations Surface Drainage Port Railway G03 Support Wall Track Area Bw225 Completion G04 Public Roads G06 Subsoil Improvement G08 Soil Replacement In The Connection Area To The Stock Time Limit For Receipt Of Tenders Or Requests To Participate Date 25 07 2019 Local Time 10 45 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20944319
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.