Quotation Are Invited For Integrity Inspection Of Mfo And Dfo TanksJob1031902041 Integrity InspectionStandard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest Integrity Inspection Of Mfo And Dfo Tanks At Dewa Japs P Ower Station Jebel Ali Tanks Technical Specification Mfo Storage Tank 1H 1G 18 000 M 46 505 M Dia 12 53 M Height Mf O Storage Tank 3B 3C 10 000 M 13 560 M Dia 8 930 M Height 1 Scope Of Work The Contractor Shall Be Competent And Have E Nough Experience In The Similar Work And The Work Shall Be Undertaken With Utmost Safety To The Plant And Humans Working Under Him A Nd Nearby The Contractor Should Have Valid License Under Dubai Municipality To Inspect And Report The Findings The Contractor Sh All Arrange All The Equipment Accessories And Tools For Inspection Of The Tank Dewa Shall Pump Out The Oil From The Tank And Clea N The Tank Inside After Cleaning The Tank Should Be Handed Over To The Contractor Gas Free And In A Condition That The Work Can B E Carried Out Safely The Contractor Is Responsible To Ensure That The Vapor Gas Have Been Completely Removed And To Ptw Permit To Work And Confined Space Entry Permit Is Provided By An Authorized Dewa Staff Electrical Power Point Shall Be Provided By Dewa At A Central Connection With Our Available Socket Connections But The Contractor Should Indicate His Electrical Power Requirement In Advance All Necessary Step Down Transformers Cables Explosion Proof Lighting And Fans Should Be Arranged By The Contractor The Contractor Must Provide All Consumables For Cleaning And Necessary Ppe To His Workmen The Contractor Should Have Proper Risk Assess Ment For Using Their Testing Equipment Accessories And Tools And Should Keep At Site For Ready Reference The Fuel Oil Tanks Are D Eclared As Hazardous Zones And The Personnel Engaged On This Job Should Exercise Extreme Caution And Refrain From All Activities W Hich Can Cause A Fire Hazard In The Tank Farm Necessary Firefighting Precautions Shall Be Taken Care In Coordination With Dewa Th E Contractor Shall Be Responsible For Safety Of His Equipment And Personnel And Will Follow All Established Codes Of Practices On Sa Fety And Security Within The Plant A Tool Box Talks Shall Be Conducted On Daily Basis Cleanliness Of The Area Is Of Utmost Impor Tance And The Contractor Shall Ensure This All The Time Wastes Will Be Disposed Off On A Day To Day Basis Concrete Foundation The Contractor Shall Inspect The TankIntegrity Inspection Of D Station Fuel Tanks 1H 1G 3B 3Cref For More Information And Site Visit Please Contact Person Mr Satheeshkumar Ramadoss 04 80 44806
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20919201
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.