Contract Notice Engineering Design ServicesBredowstra e Feuerwehrakademie Object PlanningDescription Construction Of A 4 Storey Basement Lecture Hall And Office Building On Parcel 1061 The New Building Will Be Built On A Four Storey Existing Building From The 80S Which Will Also Be Used As A Lecture Hall Office And Canteen Building And During The Construction Of The New Building In Operation A Transition To The Existing Building Takes Place On Each Floor In The Construction Field Is Currently A Volleyball Field Which Is To Be Relocated In The Planning In Addition To The Structural Design The Technical Infrastructure Of The Existing Building Must Be Taken Into Account In The Planning Interim Measures Must Be Taken Into Account For The Maintenance Of Operations In The Planning The Construction Of The Structures Is Planned As Reinforced Concrete Skeleton Construction Due To The Existing Subsoil The Building Must Be Founded On Piles In Advance Of This Planning A Feasibility Study Has Been Prepared On The Planning And Costs Of Which Further Planning Is To Be Agreed The Gross Floor Area Bgf Is Around 4 388 00 M2Bgf Planned Are Lecture Theaters Group Rooms Office And Meeting Rooms Changing Rooms A Fitness Room As Well As Appropriate Adjoining Rooms Such B Sanitary Areas Tea Kitchens And Technical Areas A Transition To The Existing Building Takes Place On Each Floor The Required Parking Spaces In The Outdoor Facilities Must Be Taken Into Account In The Planning Operation Of The Surrounding Buildings And Ancillary Areas On The Site Will Be Maintained In Planning Particular Care Must Be Taken To Ensure That Construction Site Operations And Traffic Are Safely Separated From The Operation Of The Fire Department Academy Taking Into Account The Existing Building Substance And Used Outdoor Facilities The Construction Site Facilities Incl Accessibility Must Be Planned Inventory Documents Of The Buildings Grounds Or Technical Infrastructure Are Scarce Appropriate Inventories And Explorations Are To Be Considered In The Planning The Cost Calculations Are To Be Set Up Separately As Required According To The Individual Uses The Building And Operation Technology Landlords And Tenants The Cost Calculations Are To Be Set Up Separately As Required According To The Individual Uses The Building And Operation Technology Landlords And Tenants Particularities Access To Construction Sites Two Parallel New Construction Measures On The Site Extension To An Existing Building In Operation Confined Spaces For Site Equipment Difficult Ground New Location Volleyball Court Interim Measures Temporaries Fire Department Bos Funk U Suspected Ordnance Explore Inventory External Noise Railway Lines And Heavy Traffic Time Limit For Receipt Of Tenders Or Requests To Participate Date 22 07 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20917085
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.