Contract Notice Construction WorkDevelopment Of Construction Area In De Brinke 1 1 Expansion Of City StreetDescription 1 1 Expansion City Street The City Of Warendorf And The Wastewater Company Warendorf Have Opened Up The B Plan Area In De Brinke In The North Of The City Area In Sections The Construction Site For The Construction Lot Described Below Can Be Reached Via The Public Traffic Areas Of The L 830 From The West And The Northern City Street The Existing Access To The Planning Area Economic Route Should Be Widened And A Turn Lane Should Be Established With Lot 1 1 The City Street North Which Runs In West East Direction Is Supplemented By A Sufficiently Powerful Access Area The Scope Of The Construction Lot Includes The Piping Of The Existing Northern Roadside Trench To About 200 M Subsequently The Traffic Area Is Widened On One Side By Approx 3 5 M The Result Is A Turning Lane Including Twisting Area And A Road Divider That Offers Pedestrians A Transition Opportunity The Marking Separation Of Construction Lot Designates The Boundary Of The Development Area The Traffic Constraints Are To Be Weighed The Development Of The City Road Is Planned In Full Block It Is To Be Considered That Also Further Entrepreneurs Of The Project Work In The Building Field The City Road North Becomes In The Current Expansion Area A Planned Last Stage Of The Stadtstra e Is Not The Scope Of This Project The Pipe System For The Planned Trench Piping Is Made Of Concrete Pipes And Prefabricated Concrete Shafts The Planned Road Construction Of The City Street North Is 65 Cm Frost Free Depth The Unbonded Base Courses Are Produced As Fss The Bituminous Attachment Is Three Layered Manufacture Changes And Or Adjustments Of The Existing Street Drainage System Is Not Provided The Bank Of The City Road North Leads To The Incurred De Rainwater In The Southern Street Side Trench The Planned Enrichment Piping On The North Side Serves As An Overflow Option For The Eastern Side Street Ditch Immediately After The Construction Of This Lot Begins Another Contracted Construction Lot Time Delays Are Mandatory To Avoid To Illustrate The Chronological Sequences The Tender Is Accompanied By A Construction Schedule Essential Masses Concrete Pipes Dn 400 Approx 130 Mconcrete Pipes Dn 500 Approx 85 Mconcrete Shafts 7 Pcs Road Divider 1 Pc Zus Road Bk 3 2 About 650 M2fss About 700 To Time Limit For Receipt Of Tenders Or Requests To Participate Date 31 07 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20852720
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.