Request For Expression Of Interest For Supervision Consultant Services Of Day Ninh Co Canal Procurement Method Quality And Cost Based SelectionNotice No Op00074139 The Socialist Republic Of Viet NamNorthern Delta Transport DevelopmentprojectCredit No 6028 VnRequest For Expressions Ofinterest Consultingservices Supervision Consultant Services Ofday Ninh Co Canal Contract No Cs A5i Dnc Ndtdp The Socialist Republic Of Vietnam Hasreceived An Additional Financing Agreement No 6028 Vnfrom The International Development Association Ida World Bank To Build The Canal Between Day River And Ninh Co River Hereinafterreferred To As Dnc Canal And Intends To Apply Part Of The Proceeds Of Thiscredit Towards The Supervision Consultant Servicesof Day Ninh Co Canal 1 Consultancy Services Introduction Consultingservices Are Required For Supervision Ofconstruction Of Works For All Main Items Of Dnc Canal As Listed Below Dnc Canal W Ill Be Built At The Shortest Distancelocation Between Day River And Ninh Co River In Nghia Hung Dicstrict Nam Dinh Province Vietn Am ItS 22Km From Ninh Co Estuary Near Do Muoi Ferry Boat Stage After Construction Dnc Canal Will Promote Investment Efficiency Of Lach Giang Area This Will Allow2 000Dwt 3 000 Dwt Vessels Access Ninh Phuc Port Ninh Binh Province The Main Items O F Dnc Canal Aconnection Canal Between Day River And Ninh Co River With The Length Of About 1Km The Width Of The Ca NalS Bottom Of 90M At Sideof Day River And 100M At Side Of Ninh Co River A Shiplock At The Middle Of The Canal Inner D Imensions Of Shiplockchamber 17M In Width 179M In Length And Elevation Of The Bottom Is 7 0M All Of Structure On The Pile Reinf Orcement Concreted800mm Bridge Over Dnc Canal With The Vertical Clearance Height Of 15M Reinforced Structure Including 18 Spans Made Ofsuper T Beams With The Length Of 777M Fixed Bridge Approach Road 1497M Support Items Navigation Aidssystem Plant Returning Dike Irrigation Items Power And Communication Systems EtcAll Documents Reports Of Sur Vey Anddetailed Engineering Design Are Available At Pmu Ws Office The Interested Consultants Can Contact Pmu W To Have Detail Edinformation Intended Time Of The Construction Work From 1St Quarter Of 2020 To 4Th Quarter Of 2021 2 Consultancy Objectives And Scope Of Work The Scope Of Work Includes Supervising The Entire Project Including Theconstruction Installation Of Equipment Of The Packages Shiplock Road Bridge Over Dnc Canal Connection Canal At Dnc Area The Connsultant Will Int Construction Instar Alia Provide Construction Supervision And Contract Management Services Asthe EngineerS RepresemanagerS Representative Depending On The Form Of Contract Used All In Accordance With Acceptedinternational Practice Includingbut Not Limited To Review Detailed Design Document And Propose Necessary Amendments Toconstruction Items Survey And Setting Out C Hecks Certification Of ContractorS Periodic Claims Quality Control Of Materials Andworkmanship Inspection Of Works Identificat Ion Preparation Review Assessment Of Variation Orders Issuance Of Site Instructionsto Contractors Assessment Of Contractors Sug Gestions And Claims For Additional Works Costs Assessment Of Delays Decisions Concerning These Matters Are To Be Made By Pmu W On The Recommendations Of The Consultants Study And Applyrelevant Regulations Of The Government Of Viet Nam And The World B Ank To Provide Supervision Services On The ContractorSperformance And Compliance With Regards To Environmental And Social Health And Safety Requirements Including Carryout Environmental Compliance Supervision And Quality Sampling And Monitoring Du Ring Construction Of The Dncworks Supervise And Ensure Compliance With Occupational And Community Health And Safety Req Uirements Includingprevention Of Social And Gender Based Violence Gbv Also Enhancing Awareness About Hiv Aids And Related Issues Supervise And Ensure Prevention Of Other Social Risks And Impacts Including Risks Posed By Labor Influx Of Thecontractors Carry Out Monitoring And Evaluating The Results And Impacts Of The Project The Consultant Willl Pro Controse Investigate Establish Systems To Collect And Analyses Necessary Statistics To Assess The Results Of The Project Aligned E Developmental Objectives And Results Framework Of The Project Promote Technology Transfer By Employingsuitably Qualifi Ed And Licensed Vietnamese Specialists And Demonstrate Effective Contract Supervision Methods 3 The Project Manage Ment Unit Of Waterways Pmu W Now Invites Eligible Consulting Firms Consultants To Indicate Their Interestin Providing The Ser Vices Interested Consultants Should Provide Information Demonstrating That They Have Adequate And Relevantexperience To Perform Th E Services As Defined Above 4 The Short Listing Criteria Are The Shortlist Will Include6 Consulting Firms Compan Ies A Short Listed Consultant Shall Meet The Following Minimum Qualification Requirements I Relevant Experience The Con Sultant Must Have At Least 10 Years Of International Experience In The Field Of Detailed Design And Orconstruction Supervision Of S Hip Lock Shipyard Canal River Training Work And At Least 5 Years Of Experience In The Field Ofdetailed Design And Or Constructio N Supervision Of Bridge Ii Experiences Of Similar Contractimplementation The Independent Consultant In The Past 10 Years From 2009 To 2019 Theconsultant Has Completed At Least 01 Construction Supervision Contract C Overing All Major Items I Ship Lock Ii Bridge Iii River Training Works Included Supervision And Monitoring Of All Crucial Eshs Aspects Environmental Social Health Includinghiv Aids And Safety For Such Major Works At The Minimum Value Of 3 Usd Mill Ion Or The Consultant Can Demonstrate Itsexperience By Having Completed 02 Two Or 03 Three Separate Contracts For Si Milar Construction Supervision Comprising Majoritems Such As I Ship Lock Ii Bridge Iii River Training Works Included Supe Rvision And Monitoring Of All Crucial Eshsaspects Environmental Social Health Including Hiv Aids And Safety For Such Major Wor Ks The Minimum Value Of Each Similarcontract To Be Considered Is Usd 1 Million And The Total Value Of Those Similar Contracts Sha Ll Not Be Less Than Usd 3Million And Collectively Cover All Major Items The Joint Venture Consultant Experience W Ill Be The Totalexperience Of Members In Which Each Partner Must Have The Capacity Corresponding To The Part Of The Work And The V Alue That Theyperform Note Similar Contracts Are Contract For Construct Ionsupervision For Bridges With A Minimum Span Length Of 40M Contract For Construction Supervision For Ship Locks Dredging And River Training Works For Minimum 2000T Vessels To Pass Environmental Social Health Andsafety Supervision And Monitoring Including Hiv Aids For Transport Infrastructure Construction Projects Foor Sim Safetylar Contracts If The Value Is In Currencies Other Than Usd The Exchange Rate Converted Into Usd Will Be Takenas The Se Rate Issued By Vietcombank On December 31 Of The Year That Contract Ends The Consultant Should Providecontact In Formation To The Client On The Contracts Listed Above Iii Working Experience In Southeast Asiancountries In The Pa St 10 Years The Consultant Has Completed At Least 01 Similar Project In Southeast Asiancountries Iv Working Experience With Projects Funded By Wb In The Past 10 Years The Contractor Has Completed At Least01 Similar Project Funded By Wb V Key Personnel Mobilization Capability The Consultant Must Demonstrate The Ability Tomobilize At Least Key Personnel With Internat Ional Experience As Follows Project Manager 01PersonChief Resident Engineer 01 PersonShipl Ock Bridge And Canal Structure Engineer 01PersonStructure Engineer 01 PersonGeotechnical Engineer 01 Pers OnMechanical Engineer 01PersonEnvironmental And Occupational Health And Safety Specialist 01 Person Li Social Development Specialists 01 PersonSenior Port Waterway Engineer 01 PersonThe Consultant Shouldprovide Evidences For These 5Criteria Eg Business Registration License Practicing Certificate Evidences Of Related Contracts Joint Venture Agreement Cvs 5 The Contract Period Will Cover The Whole Construction Period Of At Least 24 Mon Thsplus The Defects Liability Period Of 24 Months After The Completed Construction The Constructionperiod Is Expected To Start In Quarter I 2020 After The World Bank ProjectS Closing Date Payments Would Be From Gov Ernment OfvietnamS Funds 6 The Attention Of Interested Consultants Is Drawn To Paragraphs 1 9 1 13 Of The World BankSguidelines Selection And Employment Of Consultants Under Ibrd Loans And Ida Credits Grants By World Bank Borrowers Dated January 2011 Revised On July 2014 Consultant Guidelines Setting Forth The World BankS Policy On Conflict Of Interest Andeligibility For Participation And Article 5 Article 6 Of The Bidding Law No 43 2013 Qh13 7 Consultants May Associate Witth Other Eligibiliirms In The Form Of A Joint Venture Or A Sub Consultancy To Enhance Their Qualifications In Such A Case Consultants Shoulindicate Whether The Association Would Be In The Form Of A Joint Venture Or A Sub Consultancy Sub Consultantswill Be Not Evaluate D 8 A Consultant Will Be Selected In Accordance With The Quality Cost Based Selection Qcbs Methodset Out In The Consul Tant Guidelines Expressions Of Interest Must Be Delivered In A Written Form To The Address Below Inperson Or By Mail Orby Fax Or By E Mail By 16 00 Local Time On July 22 2019 Project Managementunit Of WaterwaysAttn Mr Le Huy Thang DirectorAddress No 308 Minh Khai Str Hai Ba Trung Distric Hanoi VietnamTel 84 24 3974 7633 Fax 84 24 3974 7637E Mail Pmuwhanoi Gmail Com
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20830592
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.