Contract Notice Relocation ServicesRelocation And Installation Humboldtforum Ethnological Museum And Museum Of Asian ArtDescription Art Transport Module Objects Em And Aku West Part 2Nd And 3Rd Floorwith The Establishment Of The Humboldt Forum The Urban Development Of The Historic Center Of Berlin In The Area Of The Museum Island And Unter Den Linden Is To Be Achieved A Special Fascination Of The Humboldt Forum Are The Unique Collections Of The Ethnological Museum Em And The Museum Of Asian Art Aku Of The National Museums In Berlin Stiftung Preu ischer Kulturbesitz Together With Their Sister Collections On The Museum Island They Will Complement Each Other From 2019 To A Large Universal Museum On More Than 23 000 Square Meters The Museums On The First Second And Third Floors Of The Humboldt Forum Will Present Their Archaeological Ethnological And Art Historical Collection Objects In Total About 10 000 So Called Modular And Exhibition Objects Of The Em And Aku Will Be Transferred To The Huf In Several Phases Depending On The Progress Of The Construction The Show Collection Objects Are Also Displayed In The Permanent Exhibition Areas There Are Also A Number Of Temporary Exhibition Objects In The Aku Some Of Which Must Be Transported Only After The Opening Of The Exhibitions These Are Objects That Are Exchanged At Regular Intervals And Thus Have To Be Gradually Available In The Huf These Objects Are Housed In The So Called Master And Archive Rooms In The Huf The Transport Of The Objects Takes Place In Dependence Of The Procedures Of The Transfer Of The Exhibition Architecture In The Huf The Arthandlingabl ufe Both In Dahlem Preparation And In The Huf Installation Assembly As Well As The Preparatory Measures In Dahlem Restoration Packaging Anoxia Treatment Therefore Section By Section Transports And Extensive Coordination Efforts Are To Be Expected The Aim Of The Measures Is The Packaging And The Damage Free Transport Of The Sensitive Collection Objects From The Ethnological Museum And The Museum Of Asian Art In Dahlem To The Humboldt Forum In Berlin Mitte The Service Basically Covers All Tasks Of The Art Transport Logistics D H The Planning Production And Delivery Of Adequate Transport Crates And Containers The Packing Of The Objects The Transport From The Destination To The Destination Location The Unpacking And The Transfer Of The Objects As Well As The Necessary Object Tracking For The Duration Of The Transports The Objects To Be Transported Are Roughly Divided Into Organic And Inorganic Materials In Particular The Objects Made Of Organic Materials Are Correspondingly Sensitive To Fluctuations In The Relative Humidity And Vibrations All Measures Must Be Carried Out Under The Premise Of Maximum Protection And Maximum Protection Of The Objects Time Limit For Receipt Of Tenders Or Requests To Participate Date 16 07 2019 Local Time 14 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20776676
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.