Contract Notice Engineering ServicesHsta Fbt Extinguishing SystemsDescription In The Hessian Main State Archives The Existing Co2 Extinguishing System Is Replaced By A New N2 Extinguishing System The Existing Co2 Extinguishing System Has Been Shut Down Since The First Quarter Of 2017 And The Extinguishing Gas Has Already Been Disposed Of To Disassemble Is The Entire Existing Extinguishing System Including Piping And Storage Container The New Plant Is Operated Using Extinguishing Bottle Batteries The Adjoining Pipe Network Will Be Rebuilt The Quantity Of Extinguishing Agent And The Dimensions Of The Pipes Must Be Checked With Regard To The Tightness Of The Archives And Possibly Adjusted Remedial Measures Such As The Re Sealing Of The Doors Are Part Of The Planning Performance Of The Architect The Required Pressure Equalization Is Provided By 7 Exhaust Chimneys In The Existing System With Fans Connected To Them Windows Opening With New Pneumatic Drive And Outer Wall Openings Newly Created In The Measure For Personal Protection An Alarm System Is Set Up The Wiring Must Be Carried Out In Accordance With Mlar And Vds In The Phase Of Incorporation Into The Construction Project The Solution Approach Of The Pre Planned Pressure Relief Systems Should Be Checked For Easier Feasibility Furthermore A Conceptual Elaboration Of Possible More Economical Alternatives For Extinguishing Systems Is Required The Technical Planner For The Technical Equipment Is To Work On The Equipment Groups 3 7 And 8 Air Conditioning Systems Use Specific Equipment Automatic Extinguishing System Building Automation According To 53 Ff Hoai Whereby The Equipment Groups 3 And 8 Only In Connection With The Work On The Equipment Group 7 Can Be Seen The Technical Planners For Technical Equipment For Electrical Engineering And Renovation Of Building Automation Throughout The Building Have Already Been Selected The Involvement Of Engineering Consultants In The Field Of Building Physics Is Carried Out In A Separate Process Special Requirements Of The Construction Task And Specialist Planning Services According To Existing Plans The Archive Will Not Be Outsourced For This Reason The Renovation Work In The Archive Rooms Must Take Place In Sections During Operation The Archival Material Must Be Protected Separately Measures Must Be Taken To Monitor Climatic Conditions And Prevent Damage To The Archive In Particular Din Iso 11799 Requirements For The Storage Of Archive And Library Property And Din 67700 Construction Of Libraries And Archives Requirements And Recommendations For Planning Must Be Observed And Applied In Order To Avoid Damage To The Archival Material Caused By Too Long Climatic Changes The Construction Work Must Be Very Well Coordinated And The Construction Times Should Be Minimized As Far As Possible Through Economic Planning Due To The Comprehensive Renewal Work The Interfaces Between The Specialist Planning Are Of Particular Importance The Specialist Planners Require A Cooperative Collaboration With Other Specialist Planners Including Electrical Engineering Building Automation Ventilation Technology Fire Protection Systems Engineering Building Physics The Architect And The Lbih Departments During All Phases Of The Work Additional Documents Will Be Made Available To The Tenderers Invited To Tender After They Have Been Put Together In The Course Of The Further Negotiation Procedure Time Limit For Receipt Of Tenders Or Requests To Participate Date 12 07 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20711832
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.