Contract Notice Parts Accessories And Supplies For ComputersApplication Neutral Structured Cabling Of The Bayer Data Centers State Criminal OfficeDescription The Bayer Landeskriminalamt Blka Intends To Conclude A Framework Agreement With A Term Of 4 Years On The Application Neutral Structured Cabling Of 2 Bayer Data Centers State Criminal Office The Subject Of The Contract Is The Supply Of Copper Fiber Optic Cables As Well As The Installation In 2 Data Centers Of The Blka The Minimum Order Quantity Will Be The Supply Of Copper Fiber Optic Cables And Their Relocation To 2 Data Centers Optional Components Include Additional Cabling Services Consisting Of The Supply Of Additional Copper Fiber Optic Cables And Their Laying In The Data Centers On Demand As Required Data Centers Are Subject To Special Consideration Due To Their High Availability Requirements In All Technical Trades In Addition To The Basic Infrastructures Of Structural Protection Energy Supply Refrigeration And Air Conditioning Fire Protection Fire Prevention And Or Extinction Access Control Etc Is The Communication Network Cu Lwl Abbreviated Knw In The Following The Foundation For The Networking Of The Server And Network Systems Availability Security And Functionality Both In The It And The Network Environment Require A Stable Custom Tailored To The Needs Of Each User Information Technology Cabling The Communication Network Cu Lwl As The Connecting Element Between The Active Systems Must Be So Constructedthat The Required Transmission Media The Port Capacities The Interfaces Are Provided In Very Good Quality In Order To Conduct The System Operation Effectively And Efficiently The Communication Cabling Knw Is Established As Application Neutral Structured Cabling According To En 50173 1 And 5 As Well As En50600 2 4 The Connection Technique Is A Modular System That Can Be Used For Both Fiber Optic And Cu The Bavarian State Office Of Criminal Investigation Blka Intends To Renew Or Expand The Knw Infrastructure For 2 Existing Data Centers At The Locations In The Metropolitan Area Of Munich At Both Sites An Application Neutral Structured Communication Cabling Using Copper Cu And Fiber Optic Technology Lwl Is Set Up In Accordance With The Current State Of Standardization And Technology The Knw Infrastructure Is Installed During Operation So All Installation Work Must Be Carried Out With The Utmost Care In Order Not To Endanger The Rz Operation Precautions During Installation Such As Covers Barriers Etc By The Contractor The Deployed Personnel Must Be Familiar With Working In The Data Center Environment And Be Aware Of Potential Risks In The First Data Center Almost The Entire Knw Infrastructure Will Be Renewed The Wiring Must Be Laid In Existing Routes And Installed In New Existing Cabinets In Addition The Power Strips Pdus Required For The Data Center Infrastructure Must Be Supplied And Installed As Already Mentioned The Renewal Of The Knw Infrastructure Takes Place During Operation Which Means That The Cabling Is Set Up In Execution Steps In Rows Between The Individual Execution Steps Rebuilding Measures Must Be Carried Out By The Blka Staff Only After Completion Of This The Implementation Of Another Step Is Possible The Second Data Center Will Expand The Existing Kwn Infrastructure Starting With The Main Distributor The Existing Server Racks And 3 New Server Series With Knw Infrastructure Will Be Expanded As In The Rz1 The Cables Are Laid On Existing Cable Trays Above The Racks The Extension Of The Cabling In The Pm2 Is Also Carried Out During Operation Which Also Means That The Cabling Takes Place In Partial Steps General Basically The Following Design Features Apply Central Fiber Optic Cable And Splicing Technology Must Be Used In Fiber Optic Technology A Modular System Must Be Used As Connection Technology That Can Be Used For Both Fiber Optic And Cu Individual Cables And Module Connection Technology Are To Be Set Up In The Cu Area Pre Assembled Trunks Or Cables Are Not Permitted All Cables Must Be Brought In On Site Without Excess Length Quality Requirements The Blka Attaches Great Importance To Clean Professional And Technically Perfect Execution And Processing The Quality Requirements And Technical Specifications Listed In The Specification Of Services Must Be MetTime Limit For Receipt Of Tenders Or Requests To Participate 13 7 2019 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20710818
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.