Contract Notice Construction Work For Water And Sewage PipelinesImplementation Of Engineering Design Exercising Of Authors Supervision And Execution Of Construction Works On The Site Reconstruction And Completion Of Part Of Chief Branch I Ch Clones Iii Iv And Clones 2 28 34 In Ii 1 4 Description The Object Of The Contract Is Engineering The Preparation Of A Detailed Design And Construction Works In Connection With The Reconstruction Of Main And Secondary Branches And The Necessary Facilities From The Low Zone Of The Water Supply Network Of The Town Of Zlatitsa And The Exercise Of Authors Supervision The Total Length Of The Plumbing Branches Envisaged For Reconstruction Is 5 140 M The Reconstruction Includes The Replacement Of The Existing Water And Sewerage Network With High Density Polyethylene Pipes Pevp Meeting Modern Hygienic And Technical Requirements The Scope Of The Contract Includes The Implementation Of The Following Activities Which Are Related To The Elaboration Of A Detailed Design And Execution Of The Construction Works 1 Preparation Of Detailed Design By Checking And Dimensioning The Whole Existing Water Supply Network Of Zlatitsa On The Basis Of An Approved Water Supply Standard In The Preparation Of The Project Take Into Account The General Plan For Development Of The Municipality Of Zlatitsa Including Nsi Data On The Demographic Development Of The Municipality The Cadastral And Regulatory Plan Of The Town Of Zlatitsa Data From The Water And Sewerage Operator For The Existing Water Supply Network Existing Road Surfaces 2 Implementation Of The Construction And Assembly Works Necessary And Corresponding To The Technical Specification In Connection With The Envisaged Reconstruction 3 Delivery And Installation In Construction Of The Necessary Construction Products Building Materials Articles Elements Details Sets Etc Which Comply With The Technical Specifications 4 Perform The Necessary Tests And Laboratory Tests 5 Participation In The Procedure Of Acceptance Of The Construction Protocol For Acceptance Of Quality Construction Works 6 Warranty Maintenance Of The Facility Including Removal Of Defects During The Warranty Period The Objectives Of This Procedure Are Improving The Status And Functioning Of The Urban Water Supply Network Improvement Of Water Resources By Reducing The Quantity Of Water Supplied As A Result Of Reduction Of Total Water Losses After The Rehabilitation Of Part Of The Low Zone Of The Settlement Improving The Quality Of The Water Service Reduction Of The Maintenance Costs Of The Water Supply Network The Full Description Of The Envisaged Activities Is Described In Detail In The Documentation For Participation In The Procedure S The Technical Specification And The Terms Of Reference Which Form An Integral Part Of The Documentation Of This Tender Time Limit For Receipt Of Tenders Or Requests To Participate Date 15 07 2019 Local Time 17 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20694549
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.