Contract Notice Architectural Construction Engineering And Inspection ServicesPreparation Of Planning Documents For Site Adaptation And Media Relocation In The Eastern Area Of The Industrial Waste Facility Iaa CulmitzschDescription On Behalf Of The Federal Republic Of Germany Wismut Gmbh Is Renovating The Legacies Of Uranium Ore Mining As Well As The Uranium Ore Processing Of The Sdag Bismuth In Thuringia And Saxony The Custody Of Industrial Tailing Plants Iaa In The Area Of Ronneburg Rehabilitation Is Carried Out According To The Variant Of In Situ Custody With Technical Partial Drainage Which Was Founded By Wismut And Supported By The Bmu In The Main Steps Of Open Water Lowering Intermediate Cover Contouring End Cover And Flood Catchment The Refurbishment Order Of Wismut At The Seelingst dt Location Includes The Iaa Culmitzsch With Its Immediate Surroundings The Custody Of The Iaa Culmitzsch Is Currently Being Implemented The Custody Steps Of The Open Water Lowering And Intermediate Cover In The Two Basins A And B Of The Iaa Have Already Been Completed At The Same Time The Measures Of Contouring End Cover And Flood Connection Of The Iaa Culmitzsch Are Currently Underway And In Sections All Current Measures Are Underpinned By Appropriate Planning And Are Covered By Licensing Law In The Mining Radiation Protection And Water Legislation One Of The Tlubn Previously Tlba Approval Law Specification Is The Complete Dismantling Of The Lokhalde On The Eastern Edge Of The Iaa Culmitzsch In All Previous Planning For The Contouring End Coverage And Flood Connection Of The Iaa Culmitzsch Adaptation Measures Of The Then Rehabilitated Settling Plant Culmitzsch To The Eastern Periphery In Particular To The Uncovered Heap Footprint Of The Lokhalde Were Not Planned With The Planning To Be Carried Out Here An Adaptation Of The Terrain In A Given Corridor Between The Eastern Planning Boundary Of The Iaa Culmitzsch End Cover And The Uncovered Western Heap Footprint Of The Lokhalde Including The Necessary Infrastructure And Media Redeployment Has To Be Worked Out Conditions For A Later Offer And The Contractual Implementation Basic Services Of The Achievement Picture Engineering Structures 43 Hoai Fee Zone Iii With Allowable Costs After Cost Estimate 3 000 000 Eur Performance Phases 1 4 Optionally Gradual Performance Phases 5 9 Basic Services Of The Performance Picture Technical Equipment 55 Hoai Fee Zone Ii With Chargeable Costs According To Cost Estimate 1 000 000 Eur Performance Phases 1 4 Optionally Gradual Performance Phases 5 9 Basic Services Of The Benefit Phase 7 Are Only Partially To Be Provided See Attached Documents Possible Supplements To The Planning Requirements Must Be Marked Visibly By The Bidder In His Bid For Applicants Based In Germany Bidders Can Change The Fee Schedules According To Hoai For The Respective Service Phases With Justification The Undershooting Of The Minimum Fees May Only Be Made In Exceptional Cases 7 Abs 3 Hoai And Require The Grounds Of The Bidder In The Offer Unconditional Discounts Which Lead To Falling Below The Minimum Rates 7 Abs 1 Hoai Are Inadmissible All Applicants The Tender Documents For The Second Stage Of The Evaluation Matrix Procedure As Well As The Detailed Specifications Will Only Be Sent To The Selected Candidates Who Sent The Call For Tenders Time Limit For Receipt Of Tenders Or Requests To Participate Date 25 07 2019 Local Time 09 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20603428
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.