Contract Notice Electrical Installation Work Of Heating And Other Electrical Building EquipmentSchool Center Saarn Msr TechnologyDescription The Construction Project Involves The Technical Renovation Of The Comprehensive School On The Lehnerstra e In M lheim An Der Ruhr The Building Is Located In The Saarn District And Is Being Completely Refurbished And Renovated The Comprehensive School Is Built Over 4 Floors And Is Built In The Whole Area In The Second Basement Are Only Technical Centers And Storage Rooms That Are Not Free For School Use On The 1St Floor Is The Ventilation Center Where All The Ventilation Systems For The Comprehensive School Are Installed At The Time Of The Construction An Rlt System Will Be Installed In The V G Headquarters Must Remain In Operation This Facility Supplies The Science And Computer Rooms In The Vocational College On The Floors 1St Floor 1St Floor Are Classrooms Cleaning Agents And Storage Rooms Furthermore There Are Toilet Facilities And Social Rooms In The Floors There Are Several Classrooms Used For Chemistry Physics And Biology Classes There Is A Break Toilet Facilities To Commit To The Schoolyard This Is Room High Basement The Heat Supply For The Building And The Rlt Systems Is In The Technical Center In The 2Nd Basement The Drinking Water Connection Is Also In The Same Technical Center And Supplies The Comprehensive School And The Vocational College The Object Is Heated Via A District Heating Connection As A Heat Generator System Installation In The 2Nd Basement The Heating Distribution Lines Are Also In The Second Basement The Distribution Takes Place Via Five Control Loops Plus A Reserve Control Circuit 1 Static Heating Circuit Comprehensive Schoolcontrol Circuit 2 Dynamic Heating Circuit Vocational College Distributioncontrol Circuit 3 Dynamic Heating Circuit Mensa Distributioncontrol Circuit 4 Dynamic Heating Circuit Comprehensive School Rlt Systemscontrol Circuit 5 Dynamic Heating Circuit Sports Hall Distributionfor The Four Rlt Systems In The First Basement Ventilation Central An Additional Heating Distributor Also In The Ventilation Center With Four Dynamic Control Loops Plus A Reserve Is Planned The Regulation Of The Control Circuits Is Weather Related The Transmission Medium Used Is Hot Water With The System Temperature Specification Of The Forward And Reverse Flows In The Control Loop And On Average 70 50Oc In The Direct Connection Is The Berufskolleg Saarn For This Reason Noise Intensive Work In Advance With The Local Construction Management To Agree And Clarify Whether They Are To Be Carried Out For The Product Msr Special Reference Is Made To The Following Provisions In The Latest Version They Must Be Adhered To At Least Unless Further Details Are Specified Below Time Limit For Receipt Of Tenders Or Requests To Participate Date 05 07 2019 Local Time 11 30 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20600774
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.