Contract notice Architectural Engineering and Planning ServicesPlanning services for the new construction of the 2 field sports hall of the vocational school of economy and administration NeubrandenburgDescription Due to the local location of the building plot the sports hall is planned as a solitaire There are no urban planning constraints regarding the design and the preservation of spaces The building is divided into 2 parts The hall area is the defining element due to its height In the southern direction the social tract joins in which all necessary functional and ancillary rooms have been arranged The social wing is structured by 2 high points gym and entrance area So that the entire building is to be taken as an element a uniform plaster surface is laid around the entire building The height of the plaster surface corresponds to the height of the facade of the entire social wing Above the plaster surface in the hall area and around the two high points in the social wing an HPL panel cladding is applied The strong massive effect of the hall complex is thereby withdrawn In order to create the best possible pathway to the existing school complex the barrier free entrance situation is arranged directly in the area of the northern exit from the grounds of the vocational school for economics and administration Over the windscreen the students and visitors arrive directly at the changing rooms with the integrated washing toilet and shower areas Through the corridor the students reach the hall area directly For optimum orientation in the hall the internal access doors receive glass cut outs In the staff rooms which are centrally located windows are arranged to the hall area to allow direct insight into sports hall The sports hall is designed for simultaneous use by 2 classes Due to the provided curtain the hall area can be divided into 2 halves of the game so as to conduct independent physical education The respective two equipment rooms which are assigned directly to the hall have been positioned so that one equipment room is available for both halves of the hall The necessary technical rooms are arranged in the eastern part of the social wing Access to the technical rooms is both internal door EI30 SaC as well as through an external steel door only for technical room HLS On the north side of the sports hall one rescue door emergency exit was arranged for the respective half of the hall At the same time it is possible to transport large and bulky objects sports equipment masts etc into the sports hall The planned new construction of the 2 field sports hall corresponds to the area internal hall dimensions 22 m x 45 x 7 m of the DIN 18032 The necessary distance surfaces to the property boundary are kept Time limit for receipt of tenders or requests to participate Date 21 06 2019 Local time 10 00 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20370128
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.