Contract Notice Waste Treatment Plant Construction WorkNew Construction Of A Biomass Fermentation PlantDescription The Services Include The Planning And Construction Of The Construction And Process Engineering Parts Of A Biowaste Fermentation Plant Including Commissioning And Documentation These Services Include The Be 1 Waste Treatment Inter Alia Interim Storage Bunker Gantry Crane Integration Of The Separately Assigned Treatment Line For The Biogas Conveyor Belts Be 2 Fermentation 2 Stage In A Plug Flow Fermenter With Downstream Secondary Fermenter Be 3 Biogas 2 Chp Be 4 Exhaust Air Be 5 Drying Be 6 Water Collection Distribution And Discharge Of All The Water And Wastewater Volumes In The System And The Be 7 Heat Heat Produced In The Chp Is To Be Collected Centrally And Temporarily Stored If Necessary As Well As Electrical Control And Automation Technology And Construction Technology And Infrastructure Time Limit For Receipt Of Tenders Or Requests To Participate Date 13 06 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20215297
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.