Contract Notice Ventilation Installation WorkHall 1 Plus New Building Ventilation TechnologyDescription The Ventilation Related Development Of The Exhibition Hall Will Be Realized Via 4 Plants Directly From The Dachzentralentechnikebene S dkopf And Nordkopf In S dkopf The Conference Areas As Well As The Kitchen Area Only Supply Air Are Supplied Via One Of The Above Mentioned Facilities Due To The Low Supply Air Temperature In The Case Of Cooling At A Measuring Operation Of 14 C The Post Conditioning Of The Kitchen And Konverenzbereiche Done Via Electrical Nachheizregister In The Case Of Heating Parallel Operation Of The Exhibition Areas During The Heating Phase Supply Air Temperature Up To 25 C And Meeting Conference Rooms The User Has The Option Of Controlling The Room Temperature At The Office Level Using Natural Ventilation Window Ventilation The Ventilation And Air Conditioning Units Are Placed On The Roof Surfaces Of The Technical Areas Via Reinforced Concrete Foundations For The Purpose Of Maintaining The Air Handling Units There Is A Steel Platform With A Lattice Roasting Layer Along One Longitudinal Side Of The Air Handling Units The Fuse On The Roof Of The Hall Is Made By Dealers Kg 430 Air Conditioning Systems For The Kg 430 Ventilation Systems The Following Installations Are Necessary Kg 430 Channels And Pipe Incl Insulation Ventilation Pipes Approx 9 200 M2 Coilers And Fittings Approx 2 750 M Dn 100 Dn 1250 Air Duct Flexible Aluminum Approx 220 M Dn 80 Dn 900 Air Duct For Kitchen Exhaust Air About 260 M2 Installation Components Approx 250 Pieces Air Inlets And Outlets About 420 Pieces Deflector Hood 2 Pieces Dn 400 Dn 630 Fire Damper Incl Drive Approx 130 Pieces Kg 431 Ventilation Systems Central Air Handling Unit 1 Piece 10 500 M3 H Air Conditioning Central Unit 1 Piece 7 000 M3 H Air Conditioning Central Unit Kitchen 1 Piece 10 000 M3 H Exhaust Fan 2 Pieces 20 M3 H Smoke Extract Fan 1 Piece 1 500 M3 H Smoke Extraction Fan 1 Piece 2 250 M3 H Kg 432 Partial Air Conditioners Central Air Handling Unit 2 Pieces 90 000 M3 H Central Air Handling Unit 2 Pieces 95 000 M3 H Thrust Fan 1 Piece 13 500 M3 H Thrust Fan 1 Piece 5 640 M3 H Time Limit For Receipt Of Tenders Or Requests To Participate Date 17 06 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20191025
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.