Contract Notice Engineering ServicesRehabilitation And Restoration Of The Lindenau Museum Altenburg Planning Services Technical Equipment EltDescription Job Specific Engineering Services Are Commissioned In Accordance With 53 Ff Hoai 2013 In The Building An Alarm And Security System Are Needed Which Unobtrusively In The Exhibition Areas Intergieren All Elt Systems Including All Lines For High And Low Current In The House As Well As The Emergency Lighting And Exhibition Lighting Will Be Renewed The Requirements For Fire Protection And The Msr Technology Must Be Observed And Included The Client Reserves A Stepwise Commissioning Of The Service Phases According To 53 Ff Hoai 2013 The Planned Construction Period Is 24 Months Including Restoration The Refurbishment Of The Property Is Classified For The Investment Group 7 In The Fee Zone Ii And For The Investment Groups 4 5 And 8 In The Fee Zone Iii Minimum Rate According To Points Rating According To The Task No Significant Interventions In The Construction Due To The Numerous Specifications Of The Preservation Of Monuments Are To Be Expected Thus The Characteristics Of 2 Abs 5 Hoai 2013 Are Not Fulfilled Therefore The Maintenance Surcharge According To 2 8 And 9 Of The Hoai 2013 Is Proposed The Criteria Of The Hoai Are To Be Used For The Application Of The Co Processing Building Substance Pursuant To 2 7 In Conjunction With 4 3 Of The Hoai 2013 Only The Building Substance Can Be Counted As A Fee Basis Which In The Context Of The Actual Confrontation With The New Planning Concept A Change Intervention And New Purpose Is Supplied Since The Application Phase Of Section 4 3 Of The Hoai 2013 Will Only Be Sufficient With The Performance Phase 3 The Assessment Of The Mvbs Will Be Based On The Following Criteria A Detection Of The Required Intervention In The Building Structure Whereby Demolition And Removal Are Not Eligible Planned Changes And New Purpose Are Parts Such As Ceramics Workshop Wc Elevator B Description Of The Capitalization Costs Incurred Directly On The Co Processing Buildings Z B Shaft For The Elevator C In Summary The Client Prefers The Evaluation As Follows Cost Of Co Processing Building Substance The Quantity X The Value X The Value Factor X Weighted Power Factor For All Work Phases The Interfaces To The Tied Specialist Planners The Integration Of Their Planning Services In The Context Of Scheduling And Cost Planning And The Award Procedure Must Be Observed The Client Reserves The Right Over The Entire Project Period To Commission The Additional Services Individually Broken Down Into Construction Phases And Phases Of Service Or Otherwise Modified According To The Above Description A Total Of Eur 2 249 Million Kg 440 450 480 Eur 976 200 Is Recognized As Allowable Costs For The Cost Group 400 The Chargeable Costs Are Specified On Presentation Of The Cost Calculation To Be Confirmed By The Client And Depending On The Planning Services Provided Allocated To The Respective Performance Picture According To Hoai 2013 The Maintenance Surcharge Is Set At 20 For Performance Phase 5 And 8 Respectively Time Limit For Receipt Of Tenders Or Requests To Participate Date 17 06 2019 Local Time 14 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20188501
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.