Contract Notice Surface Work For StreetsCurrent Repair Of Streets And Roads In The Municipality Berkovitsa For The Year 2019 In Two Separate Positions Description The Types Of Cmp Cpp And The Total Estimated Quantities Of Works Included In The Lot Are Pouring With Dense Asphaltic Concrete At A Thickness Of 5 Cm On Average With Cutting And Pouring The Joint With Bitumen 1 650 M2 Including All Related Costs Cutting Of Asphalt Concrete With Cutter Removal Of Material By Pneumatic Breaker At A Thickness Of 5 Cm On Average Cleaning Loading And Transportation Of Waste On Transport Up To 30 Km Treatment With A Spatter Of Bitumen Emulsion For Connection Of Layers Of Old And New Asphalt Concrete Pouring With Dense Asphalt Concrete At An Average Thickness Of 5 Cm Floating The Joints With Bitumen And Sprinkling With Stone Flour Sand Pouring With Dense Asphalt Concrete At A Thickness Of 5 Cm On Average With Milling And Pouring The Joint With Bitumen 1 370 M2 Including All Related Costs Milling Of Existing Asphalt Concrete Flooring Up To 5 Cm Milling With Rectangular Milling Cleaning Loading And Transport Of Waste On Transport Up To 30 Km Treatment With A Bitumen Emulsion Spill For Connection Of Layers Of Old And New Asphalt Concrete Pouring With Dense Asphalt Concrete At An Average Thickness Of 5 Cm Filling The Joints With Bitumen And Sprinkling With Stone Flour Sand Lifting Rings Of Fh With F100 In Asphalt Pavement 23 Pcs Rings Comply With Bss 5773 Lifting Existing Fhds To The Level Of Road Cover Involves Lifting Existing Inspection Shafts To Achieve A Certain Level Of Adjoining Road Surface Including The Following Technical Operations Asphalt Cutting Concrete Breakdown Concrete Segments And Asphalting A Layer Of Dense Asphalt Concrete With An Average Thickness Of Up To 6 Cm Prior To The Commencement Of The Construction The Repairs Will Be Undertaken With Representatives Of Berkovitsa Municipality And The Contractor On The Spot Will Be Specified Which Sections Will Be Repaired And What Types Of Works Will Be Executed All Defective Materials Are Removed From The Site And Defective Works Are Destroyed By The Contractor At His Expense All Types Of Construction Installation And Repair Works Will Be Carried Out In Compliance With All Technological Requirements And Sequence Of Operations As Well As With The Observance Of The Provisions Of The European And National Legislation The Financing Of The Public Procurement Under The Separate Item Is From The Budget Of The Municipality Of Berkovitsa Own Funds The Full Information On The Scope Volume And Requirements For The Performance Of The Public Procurement Is Detailed And Regulated In The Technical Specification For Lots Which Is An Integral Part Of This Documentation Time Limit For Receipt Of Tenders Or Requests To Participate Date 18 06 2019 Local Time 17 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20178095
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.