Contract Notice Architectural Construction Engineering And Inspection Services2019 0182 Gs Vp 700 B 100 001 Project Planning School Extension Buildings Aakerf hrstra e DuisburgDescription The Construction Measures Will Be Implemented As Part Of Nrw Banks Good School 2020 Funding Program The 2 Speed Ggs Astrid Lindgren School At Aakerf hrstra e 80 In The Duisburg District Of Duissern Started School On 22 August 1977 Currently The School Is In A School Development Process To The City Community Elementary School With Montessori Education In A Multi Year Organizational Form The Main Building 1 Has 8 Classrooms Each 62 Square Meters 4 Of Them On The Ground Floor And 4 On The First Floor The Multi Purpose Room On The First Floor With 78 Square Meters Is Also Used As A Classroom And Serves As Ogs And As A Meeting Room As The School Has No Auditorium There Is A Pc Room On The First Floor Also With 78 Square Meters Which Will Be Used As An Additional Classroom And For The Ogs Due To The Limited Space Situation Currently And With A New Multifunctional Facility From The School Year 2018 19 Since Sj 2014 15 The Sch le Has 3 Temporary Container Classrooms In Multiple Use As Ogs Vht Rooms Almost All Rooms Are Due To The Lack Of Space In A Double Multiple Use And Are Used Throughout The School Day Into The Afternoon The Ogs Is Located In An Outbuilding No 2 Former Caretakers House There Are Kitchen Cafeteria 1 Room For The Management Of The Ogs Toilet Facilities Including 1 X Barrier Free And In An Annex 2 Group Rooms Available The Subject Of Inclusion Is Lived At The School There Is A Barrier Free Toilet Facility In The Ec However A Nursing Room And A Therapy Room Are Completely Missing There Is Also No Rest Room The School Is Also Not Barrier Free Designed In Particular There Is A Lack Of Rooms For Social Workers And Other External Staff I Helpers The Toilet Facilities Of The Sus Are Located Outside The Building And Are Reached Through The Covered Pause Hall There Is No Sports Hall On The School Grounds For The Planned Expansion By 2 Trains 8 Classrooms With The Associated Differentiation Multi Purpose And Ancillary Rooms And A Teaching Aid Room A Refectory With 240 Sqm And Lockable Kitchen Area With Output Unit And A Storage Room At Least 10 Sqm And An Adjoining Room With 30 Sqm Needed In Addition There Are 2 More Ogs Group Rooms And The Conversion Of 4 Classrooms By Multifunctional Furniture As Additional Ogs Rooms A Counseling Meeting Room 2 Teacher Work Rooms 1 Teachers Room 1 Copy Room 1 Office For School Social Work 1 Nursing Room 1 Therapy Room Must Also Be Created In The Planning The Multifunctional Concept Is To Be Followed In The Attached Needs Analysis The Chargeable Costs Are Around 3 500 000 Eur Net In Addition To The Extension Of The School Room A Toilet System Is To Be Renovated With The Replacement Of The Supply And Disposal Lines And The Sanitary Equipment Adaptation To The Requirements For Compliance With Accessibility The Chargeable Costs Are About 100 000 Eur Net Time Limit For Receipt Of Tenders Or Requests To Participate Date 12 06 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20169786
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.