Contract Notice Road Construction WorksDesignation Of A Contractor For The Construction Of 6 Six Sites Lot 31 Lot 32 Lot 33 Lot 34 Lot 35 And Lot 36 Of The Regions For Growth 2014 2020 By LotDescription Road Construction Ii 53 Includes The Rehabilitation Of 2 Two Road Sections With The Following Features Total Length 26 991 Km Section 1 Plane Length 11 890 Km Start Of The Section Km 34 400 End Of Plot Km 46 290 Section 2 Plane Length 15 101 Km Start Of The Section Km 72 200 End Of Plot Km 87 301 Technical Characteristics Of The Existing Road Class Of Road 2Nd Terrain Hilly Gauge Variable G7 10 50 Section 1 Floor Width From 5 M To 7 M Banquet With Variable Width Sidewalks Of Varying Width Speed From 50 To 70 Km H Passage Through Settlements Elena From Km 43 871 To Km 46 290 Small Facilities And Drainage Water Drainage Facilities There Are 4 Four Pipes 15 Fifteen Plates 14 Fourteen Number Of Arches 4 Four Pieces And One One Number Of Oodidas 2 Two Transverse Pipe Drains Drainage Is Carried Out By Means Of Gutters Lined And Non Lined Trenches Concrete Curbs And Concrete Rigs And Rainwater And Inspection Shafts Retaining And Fortification Walls There Are Existing Supporting Walls Of Stonework And Concrete As Well As A Concrete Pocket Wall Collapses There Are Collapsed Areas In The Area Large Facilities An Arched Bridge Over The Zlatarishka River At Km 38 771 An Arched Bridge At Km 39 385 Railway Overpass At Km 40 049 Bridge Per Km 44 430 An Arched Bridge Over The Kostelska River At Km 45 307 Road Junctions Km 35 494 Intersection With Road Iii 4004 At Km 46 291 Intersection With Road Iii 551 Communications And Facilities Of Other Departments 9 Nine Lines Intersect Section 2 Floor Width From 5 M To 8 M Banquets From 2X1 00 M To 2 1 50 M Sidewalks Of Varying Width Speed From 50 To 60 Km H Passage Through Settlements The Village Of Stara Reka From Km 75 690 To Km 78 113 Small Facilities And Drainage Water Drainage Facilities There Are 4 Four Pipes 14 Fourteen Plates And 6 Six Arched Drains 1 One Number Of Trumpet Drainage Is Carried Out By Means Of Gutters Lined And Non Lined Trenches Concrete Curbs And Concrete Rigs And Rainwater And Inspection Shafts Retaining And Fortification Walls There Is An Existing Masonry Retaining Wall In The Area Large Facilities Bridge Per Km 72 322 Bridge Per Km 74 308 Road Junctions At Km 73 787 Intersection With Road Iii 484 At Km 76 912 Intersection With Road Slv3066 Iv 53032 At Km 78 019 In The Regulation Of The Village Of Stara Reka At Km 82 710 Intersection With Road Vtr1075 Bojevtsi At Km 87 301 An Asphalt Road Crossing For The Village Of Rakovo Communications And Facilities Of Other Institutions 8 Eight Power Lines Intersect Along The Road There Are Communications Of Water Electricity And Tt Cables Time Limit For Receipt Of Tenders Or Requests To Participate Date 13 06 2019 Local Time 17 30 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20167193
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.