Contract Notice Ventilation Installation WorkGewerbeschule Rheinfelden New Construction Vehicle Workshop Ventilation TechnologyDescription General The Landratsamt L rrach Intends To Demolish Part Of The Existing School Buildings And Workshops At The Location Of The Gewerbeschule Rheinfelden Hardtstra e 12 At This Location The Construction Of A New School Building With Car Repair Shops Is Underway Location Of The Construction Site 79618 Rheinfelden Hardtstra e 12 New Construction Of Car Workshops With Classrooms And Storage Rooms Access Options Access Via The Developed Hard Road To The School Grounds The Schoolyard And The Outdoor Area Will Be Accessible During Construction Only For Site Traffic Type And Location Of The Structures A Part Of The Gewerbeschule Rheinfelden Is To Be Canceled On This Area 3 Garages Several Class And Staff Rooms Sanitary Areas And Storage Rooms Will Be Built The New Building Has A Basement Ground Floor And First Floor This Newly Built Part Is Attached To The Existing Head Construction This Head Structure Will Not Be Rebuilt But Will Be Preserved And Rehabilitated It Also Houses Workshops Classrooms And Staff Rooms The Property Is At Ground Level And Easily Accessible The School Operation Continues During The Entire Construction Phase Thus Ensuring Adequate Protection Of The Construction Site Storage Areas And The Driveways Any Rest Periods During Exam Periods Must Be Taken Into Consideration After Consulting The School Management Storage Areas Areas Of The Schoolyard The Newly Created Yard Area Between Workshop And Carport Facility And The Area Outside The Carport Facility Can Be Used As A Ground Floor Storage Area For The Construction Site Working Sections The Construction Measure Is To Be Considered As A Whole Measure First The Deconstruction Of The Existing Building And The Gutting Of The Head Structure Then The New Construction Of The Workshops And Classrooms Is To Be Created Parallel To The Renovation Of The Building Of The Head The Carport System Is The Last One So That The Area Can Be Used As A Storage Area Beforehand The Following Rlt Systems Are Planned In The New Premises Wch And Social Areaventilation System With An Air Volume Of 1200M3 H As Ceiling Mounted Flat Unit With Plate Heat Exchanger As Heat Recovery Filter Stages And A Pww Heating Coil For Reheating The Supply Air Teaching Workshops One Exhaust Gas Extraction System With 3 Hose Receivers And A Central Exhaust Fan Approx 1 600 M Each3 H One Supply Air Supply Each Via A Flat Device With Pww Heating Coil Dynamometer Ventilation System With 5 000 M3 H For Cooling The Dynamometer Without Heat Recovery And For Tracking The Supply Air For Exhaust Gas Extraction Exhaust Gas Extraction With 2 Lateral Consumers And An Exhaust Air Fan 3 000 M3 H Classrooms 2 Decentralized Ceiling Ventilation Units Specially Developed For Classrooms With Co2 Control Pww Register And Heat Recovery The Systems Are Connected To The Existing Building Management System Via A Modbus Interface Time Limit For Receipt Of Tenders Or Requests To Participate Date 18 06 2019 Local Time 10 30 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19820509
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.