Contract Notice Electrical Wiring And Fitting WorkSana Hospital Templin Integration Of Outpatient Facilities And Central Services 127 1 2 Electrical Engineering New Building Including ChpDescription 127 1 Kg 440 Heavy Current In A Ground Floor New Building Low Voltage Connection Via On Site Empty Pipe Manhole System Of Existing Nshv Av And Nshv Sv Adaptations Required Installation As Sub Plaster Execution In Masonry And Pre Walls Laying Of Cables And Pipes On The Unfinished Floor And In False Ceilings As Well As In Creating Masonry Slits Creation Of One Distributor Av And A Distributor Sv In The E30 Housing Sub Distributor As Wall Mounting For A Small Kitchen Power Supply For Air Conditioning And Ventilation Via Distributor On The Roof 2 Produce Component C Cable Laying In Stock Fire Protection Measures Cable Insulation And Fire Protection Channels Production Of General Lighting Av And Sv And Illuminated Escape Route Markings Producing A Sun Protection Control Overvoltage Protection Measures And Equipotential Bonding Lightning Protection Separate Lot High Current In Component M Disassembly Of The Existing Installationinstallation As A Sub Plaster Execution In Masonry And Pretexts Laying Of Cables And Wires In Suspended Ceilings As Well As In Masonry Slits To Be Createdpower Supply From The New Fire Protection Measures Kabelschottungen Production Of A General Lighting Av And Sv As Well As Illuminated Escape Route Marking Heavy Current Chp Cable Laying In The Outdoor Area In An On Site Trench Producing Breakthroughs For The Wiring In The 2Nd Basement And 1St Basement Producing A Route From Chp To Nshv Av Converter Cabinet For Energy Meteringovervoltage Protection Equipotential Bonding Lightning Protection Separate Lot Dismantling And Conversions For The Route Of Electrical Heating And Gas New Lighting In The Room Heating Central 2Nd Basement 127 2 Kg 450 Low Power In A Ground Floor New Building Production Of A Passive Data Network Installation Of A Data Cabinet In The New Building And Connection With Copper And Fiber Optic Cable From The First Floor Cable Laying For A Fire Alarm System Active Components In Separate Lot Cable Laying For A Nurse Call System Active Components In Separate Lot Extension Tv Systemovervoltage Protection Measures Low Current On The Ground Floor Component M Production Of A Passive Data Network From The Data Cabinet In The New Building Cable Laying For A Fire Alarm System Active Components In Separate Lot Production Of An Emergency Station Schwachstrom Bhkw Cable Laying In The Outdoor Area In An On Site Trench Overvoltage ProtectionTime Limit For Receipt Of Tenders Or Requests To Participate Date 18 04 2019 Local Time 15 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19334033
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.