Contract Notice Engineering Design ServicesPreparation Of Opinions And Complete Project Documentation Of Transformer Stations Located On The Territory Of Cez Distribution Bulgaria Jsc Sofia And Sofia RegionDescription Preparation Of Opinions And Complete Project Documentation Of Transformer Stations Located On The Territory Of Sofia North East North East The Term Of The Contract For Each Lot Is 48 Forty Eight Months From The Date When It Is Concluded Or Until The Maximum Value For Which It Is Concluded Depending On Which Event Will Occur First In Time The Main Types Of Works And Their Quantities Are As Follows Study Works By Parts Architectural Drawings Of Facades And Distribution Of Tps And Opinion On The State Of Existing Insulation Plaster Flooring Etc 60 Pcs Projects Constructive Opinion Issuing An Opinion On The Overall State Of The Structure 60 Electro Shooting Of The Single Line And Filling Circuit And Opinion On The Condition Of The Electrical Equipment 60 Pcs Projects Geodesy Tachymetric Photograph And Shooting Of The Surrounding Vegetation 60 Pcs Projects Constructive Investigation Capture Of Connecting Structural Parts Analysis Of Connecting Structural Elements And Collection Of Data On Inputs 17 Geological Report 17 Design Works By Parts Architectural 60 Pcs Projects Constructional 60 Pcs Projects Electric 60 Pcs Projects Geodesy 60 Pcs Projects Water And Purpose Repair 60 Pcs Projects Fire Safety 60 Pcs Projects Safety And Health Plan 60 Pcs Projects Construction Waste Management Plan 60 Pcs Projects Landscape Architecture 60 Pcs Projects Projects For Steel Roofs Of A Transformer Substation 9 300 M Constructive Part2 Part Architectural For 9 300 M2 Administrative Procedures Coordination Of The Project On All Parts With The Necessary Instances 60 Pp Procedure For Issuance Of A Building Permit 60 Execution Of Executive Drawings For All Parts 20 Pieces Exercise Of Authors Supervision 20 Pcs The Performance Of The Contract For Each Lot Will Be Made According To The Technical Readiness Of The Assignor For The Assignment Of Performance For The Assignment Of The Specific Types Of Works The Assignor Shall Draw Up A Performance Appraisal Document S Containing At Least The Following Information The Design Object And The Specific Types And Quantities Of Activities From The Quantity Value Account The Sub Projects If Any Of The Assigned Activities Coordination And Issuance Of A Building Permit If Required The Price Based On The Unit Prices Etc The Execution Of The Works On Each Assignment Document Starts After The Signing Of The Contract By The Contracting Authority And The Contractor Acceptance Of The Work On Each Performance Assignment Document Shall Be Effected By An Acceptance Protocol Signed By Both Parties To The Contract In The Manner And In The Manner Described In The Contract In Performing The Subject Of The Contract The Payment Of The Executed And Accepted Types And Quantities Of Activities Is Performed At The Unit Prices For The Respective Types Of Activities Proposed In The Value Added Account Kic Of The Tender Of The Selected Contractor Time Limit For Receipt Of Tenders Or Requests To Participate Date 28 03 2019 Local Time 16 30 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 18939055
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.