Contract Notice Railway Construction WorksMehan Sub Floor The Railroad From Km31 400 To Km33 884 With Longitude 2 484 M And Km34 544 To Km38 302 With Longitude 3 758 M Total Length 6 242 M In Between Hrabursko Swap On The 6Th Railway Line With A Master 2Nd Use Of An Assortment Description The Order Includes The Following Activities Stage I Preparation Of A Detailed Design Stage Ii Execution Of Construction Works The Following Activities Are Required Cutting Of Shrubs Branches And Single Trees In The Ease Of The Track To Find A Gauge And Provide Visibility In A Strip 15 494 M2 Bottom Building Cleaning Of Deposits From The Inland The Interior And The Outflow Of The Waterfall 105 4 M3 Delivery And Laying Of Concrete B25 66 2 M3 Delivery And Laying Of Reinforcement 6870 Kg Delivery And Laying Of Formwork 228 5 M2 Linear Excavation In Earth Rock Soils Machine For Ect 200 50 And Ppe And Transport Loading 350 M3 Linear Excavation In Earth Soils Machine For Ect And Ppe And Transport Loading 350 M3 Manual Cleaning Of The Right Handed Drainage Ditch From Stone Masonry From Km 38 246 To Km 38 304 58 M And The Left Drainage Ditch From Stone Masonry From Km 38 246 To Km 38 304 58 M With A Load Of Transport 116 M Reconstruction Cleaning And Profiling Of Earth Ditches Including Transport Of Land Masses To Landfill 800 M3 Alignment And Shaping Of Banquets On Both Sides 6 242 M Excavation For The Formation Of Berms And Slopes With Removal Of A Landfill 1 500 M3 Transport Of Earth Masses From Trench For Ditches Up To 10 Km And Breaking 50 Of Landfill 750 M3 Delivery And Laying Of Ditches From Reinforced Concrete Elements Ect 200X50 700 M Supply And Laying Of Lined Ditches 700 M Delivery And Laying Of Reinforced Concrete Canopy With Ect 200 50 700 M Construction Works Iron Road Construction Mehan Dismantling And Loading From The Interconnection Of An Existing 49 Kg M 6 242 M Railroad Unloading Complete Dismantling And Stacking Of A Dismantled Railway Road Type 49 6 242 M Spreading Units From Stamping Collection And Loading Of A Track 260 Pcs Units Ending Of The Rails Of The Second Use Ready To Use Railway Tracks Item 49 Of Reinforced Concrete Sleepers St 6 With Unscreened Elastic Fastening Skl 14 For Making Brp 1 040 Pcs Cut Replacement Of Reinforced Concrete Sleepers With Wooden Bridge Sleepers For Crossing At Km 32 975 Per Site 16 Loading Of A New Railway Track With Type 49 Rails And Reinforced Concrete Sleepers Ct6 4 023 T Transport Of Ready To Use Railway Tracks Item 49 Of Reinforced Concrete Ties St 6 With Unscrewing Elastic Fastening Skl 14 From Poduyane Railway Station To Hrabarsko Station To 40 Km 4 023 T Laying Of A New Railway 6 242 M Strengthening The Track After Laying 6 242 M Mechanized Sieving Of The Ballast Prism Without Extraction Of Segments With Spreading And Aligning Within The Easement 4 642 M Mechanized Sifting Of The Ballast Prism With Removal Of Seams And Spreading Within The Limits Of The Easement 1 600 M Making The 1St Level Mechanized 6 242 M Making The 2Nd Level Mechanized 6 242 M Making The 3Rd Level Mechanized 6 242 M Making Welds By Electrocontact 520Pcs Materials For Part Of The Track Ballast For Railway Lines 5 618 M3 New Wooden Sleepers Broadband Bridge For The Crossing Of Km 32 940 16 Elastic Fastener Skl 12 Ce 1 For Wooden Sleepers 64 Sets Delivery And Installation Of Insulated Adhesive Tape 10 Part Contact Network The Types Of Work Envisaged Are Dismantling Of The Pillar 11 Pieces Dismantling Anchor Anchor 3 Dismounting Strap Single 6 Dismantling Contact Wire 12 5 Km Dismantling Rope 14 0 Km Makes Foundation F Type C For Bmk 5 7 11 13 Straightening Of Pillar Bmk 5 7 11 13 Making Anchor Anchor Type Kia 3 Safety Fences For Narrow Excavation 13 Drainage Manually From Trenches 2 M3 Removal Of Excavation Ground 5 M3 Numbering And Dating Of Pillars And Placing Of Plates Attention Danger Of Electric Shock 245 Installation Of An Average Anchorage 11 The Qc Regulation 24 Pcs Part Signaling And Telecommunication Tracking Signal Cable With Pins 6 3 Km Interruption Of The Kew 4 Dismantling Rope For Kerv Set 8 Pcs Laying Of Cable Up To 3Kg 796 M Drilling Holes F10 In A Rail 16 Excavation 0 9 0 4 With Dilapidation 1220 M Time Limit For Receipt Of Tenders Or Requests To Participate Date 29 03 2019 Local Time 16 45 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 18565823
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.