Contract Notice Building Construction WorkReconstruction Of Stara Zagora Station Design Construction And Author SupervisionDescription The Following Activities Are Included In The Scope Of The Public Procurement Preparation And Coordination Of The Technical Project Divided Into Sub Projects Reception Building Pedestrian Subway Platforms On The 2Nd And 3Rd Platforms First Platform Post 1 Post 2 During The Construction Of The Technical Project With The Necessary Working Drawings And Details Updating Of The Technical Design And Or Work Drawings And Details During The Construction When There Is A Need To Supplement The Actual Condition In The Disclosure Of The Individual Elements Within The Scope Of The Order And Or In The Case Of Amendments To The Legal Framework And Or The Preparation Of Joint Drawings And Recordings Of The Touchpoints With Interoperable Projects And Or If Notified By The Notified Body Draw Up The Working Drawings And Details In Accordance With The Requirements Of The Prm Tsi In The Event Of Significant Deviations From The Approved Technical Design Preparation Of The Design Documentation Necessary For The Approval Of The Amendments Under The Conditions And By The Order Of Art 145 Within The Terms Of Art 144 Para 3 Of The Territorial Planning Act And For Issuance Of An Order For Supplementing The Issued Building Permit Conducting All The Coordination Procedures For The Technical Project Exercising Of Authors Supervision During Construction In The Meaning Of Art 162 Para 2 Of The Tda Updating Of The Safety Report Within The Meaning Of Ordinance No 57 On Achieving The Interoperability Of The National Railway System With The European Union Rail System Preparation Organization And Maintenance Of The Construction Site Dismantling Construction Waste Management For A Reception Building Complete Architectural Renovation Change In Functional Distribution Constructive Reinforcement Replacement Of Bearing Elements And Construction Of New Ones Replacement Of Electrical Installation Hvac Installation Indoor And Terraced Water And Sewerage Network Provision Of Accessible Environment Partial External Waterproofing Of The First Basement And Execution Of Drainage Replacement Of Floor Coverings On The First Platform And Around The Reception Building For 2Nd And 3Rd Platform Dismantling Of Existing Platforms Reinforcement And Partial Replacement Of The Supporting Structure Installation Of Lt Coating Gutters Drainage Pipes Boarding Mounting Of Suspended Ceilings Made Of Aluminum Composite Panels On Ceilings And Facings Making Of Lighting As Well As Earthing Installations For Pedestrian Underpass Waterproofing In The Area Of Track 1 And 2 Installation Of 2 Elevators For Access From The Subway To The 2Nd And 3Rd Platforms And The Electric Lift For Trolleys Replacement Of A High Voltage Installation Submarine Drainage And Sewerage Replacement Visual Communication Implementation For Post 1 Remove The Building And Build A New Building With All The Necessary Installations And Build A New Floor Around The Building For Post 2 Complete Architectural Renovation Replacement Of Electrical Plumbing Hvac Installations And Building A New Tile Around The Building Supply After Approval By The Consultant Of All Construction Products Machinery And Equipment Equipment Etc Execution Of The Construction According To The Approved Design Documentation Drawing Up Of All Acts And Protocols According To Ordinance 3 For Drafting Of Acts And Protocols During Construction Timely Acquisition And Completion Of All Building Documentation Perform All Necessary Tests Tests Inspections Of Installations Samples Single Complex And 72 Hour Under Operating Conditions Etc Preparation Of A Complete Set Of Executive Documentation And Draft For Alteration Of Cadastral Map And Cadastral Registers According To Art 54A Para 2 Of The Cpra Art 116 Para 1 And Art 175 Para 5 Of The Tda Conducting Information And Publicity Events Assistance Of The Notified Body The Consultant And The Assignor In The Process Of Putting The Site Into Operation Removal Of All Defects And Shortcomings Of The Completed Construction During The Warranty Period Of The Construction Time Limit For Receipt Of Tenders Or Requests To Participate Date 21 03 2019 Local Time 16 45 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 18380982
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.