Contract Notice Railway Bridge Construction Work3 E Eln Line 6367 Km 4 1 To 6 0 Structural Engineering Superstructure Overhead Line Systems Ve 10 Description Replacement Of 3 Railway Overpasses Over The Rivers Weisse Elster Luppe And Nahle Incl Track Upgrading Superstructure Civil Engineering Overhead Line Lst Eea And Tk Dismantling And Disposal Of Existing Structures 1 Noise Protection Wall Collision Protection Walls Execution Of The Work In 2 Main Construction Phases Length 1 Year Each With Single Track Operation In The Neighboring Track The Existing Structures Designed As Open Support Grid Structures With Bridge Beams Single Field Mounted On Massive Pillars And Abutments Year Of Construction About 1926 27 Total Length Of The Structures 55 9 M 99 3 M And 41 2 M Support Width Of The Individual Superstructures Separated Per Track 13 5 M Replacement Of The 3 E Each As A Continuous Beam With Separate Superstructures Per Track Foundation On Large Bored Piles Fall Protection Through Railings Integrated In Collision Protection Walls With Wire Mesh Filling E Wei e Elster Three Fielded Total Support Width Approx 63 M Training As Prestressed Precast Concrete Parts With In Situ Concrete Supplements Total Width 13 1 M Storede Luppe Seven Field Total Support Width Approx 108 M Training As Prestressed Precast Concrete Parts With In Situ Concrete Supplements Total Width 13 1 M Storede Nahle Three Field Total Support Width Approx 49 M Training As Prestressed Steel Composite Beams With In Situ Concrete Supplements Total Width 13 1 M Semi Integralcomplete Track Extension To Approx 1 9 Km In A New Gradient And Axis Right Track Track Distance 6 45 M Conventional Superstructure New Construction Of Overhead Line System In The Section To Be Renewed Type Re200construction Of A Noise Protection Wall With Highly Absorbent Cladding Length 210 M Height 0 5 M Above Sea Level Post Hea 160 With Pile Foundationnew Construction Of Collision Protection Walls Total Length Approx 950 M Height 4 M Above Sea Level Infill With Stainless Steel Nets Posts With Pile Foundationadaptation Lst Eea And Tkquantities Earthworks Removal And Installation Approx 1 700 M3Bridge Area Approx 38 000 M3Dam Construction Extension 3 800 M Track 5 800 St Concrete Sleepers 700 Wooden Sleepers 23 000 T Bedding Installation 3 800 M Track Standard Rail Quality R260 6 400 St Sleepers 14 000 T Bedding Installation And Removal 2 St Building Blocks Demolition Concrete About 1 800 M3 Demolition Steel About 1 400 T Built About 1 500 M2 Large Bored Piles D 1M Approx 1 400 M Bored Pile Walls Approx 450 M2 Prestressed Steel Composite Beams 36 Pieces Single Lengths 14 To 19 M Precast Prestressed Concrete Parts Approx 1 000 M3 Reinforced Concrete Without Bored Piles Approx 3 000 M3 Prestressing Steel Approx 70 T Reinforcing Steel B500b Approx 1 000 T Collision Protection Walls 1 100 M Soundproof Wall 210 M Time Limit For Receipt Of Tenders Or Requests To Participate Date 12 02 2019 Local Time 11 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 18366552
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.